BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2024 at 8:00 PM

Updated May 2, 2024

Site work and paving for a bridge / tunnel in Montville, Connecticut. Completed plans call for site work for a bridge / tunnel.

Stony Brook Utility Bridge Rehabilitation The Project includes the following Work: The work involves the rehabilitation of a steel bridge supporting domestic water and sewer piping over the Stony Brook alongside Route 32 in Montville, CT. The work includes temporary shoring and replacement of steel structures and pipe supports and rehabilitation of the existing structure. Question Deadline 04/02/2024 All questions about the meaning or intent of the Bidding Documents are to be submitted to Engineer in writing via email and directed to: Mr. Therlin Montgomery of Wright-Pierce Email: therlin.montgomery@wright-pierce.com. 21470

Bid Results

Bridges / Tunnels

$588,500.00

Public - City

Paving, Site Work

9

9

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
634
Active Projects
288
Bidding Soon
4,240
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 9, 2024

May 9, 2024

Project location map

Norwich-New London Turnpike, Montville, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.