BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 27, 2024 at 7:00 PM

Updated November 28, 2024

Site work for a playground / park / athletic field in Montville, Connecticut. Completed plans call for site work for a playground / park / athletic field.

** As of November 27, 2024 project was awarded to Maisano Brothers Inc. but amount was not disclsed.** In addition to other reservations and conditions contained in the proposal documents, the Town of Montville reserves the right to waive any technical defects in the proposals received; to waive any formalities or irregularities; to reject any and all proposals for any reason, including that it or they do not conform to the terms and conditions described herein, as determined by the Town in its sole discretion; to accept or reject any part of any proposal received; to present and negotiate terms of a contract together or separately with any party submitting a proposal; to determine qualifications exclusively and finally; to request additional qualifications; and to select any proposal or part thereof based on any combination of factors, including the amount proposal, the time of completion, and the Town's best interests. The Town further reserves the right to retain all proposals submitted and to use any ideas in a proposal regardless of whether or not that proposal is selected. The work required under this contract includes but is not limited to the following: The Contractor shall remove the existing goal posts, excavate the existing court and prepare the base for the new court to the limits shown on the plan, it is assumed that the existing base is unsuitable. The Contractor shall install no less than 6 inches of processed gravel to repair the existing base and 12 inches of gravel to form the new base. The Contractor shall install four new concrete bases with new goal posts and backboards as specified. The Contractor shall pave the court with no less than 4 inches of bituminous installed in two lifts. Other work includes striping and sealing of the new basketball court, turf establishment, and lighting.

Award

Playgrounds / Parks / Athletic Fields

$260,000.00

Public - City

Site Work

4

15

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
187
Active Projects
4
Bidding Soon
2,479
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

October 10, 2024

November 11, 2024

Project location map

To Be Determined, Montville, CT

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.