Site work for a civil project in Greenwich, Connecticut. Completed plans call for site work for a water / sewer project.

https://www.timesunion.com/news/article/greenwich-sewage-plant-grass-island-upgrade-19459218.php Cost has doubled to upgrade Greenwich's Grass Island sewage plant and fix 'single point of failure' May 27, 2024 | Andy Blye Cost has doubled to upgrade Grass Island sewage plant Andy Blye, Staff Writer GREENWICH — The Grass Island wastewater treatment plant handles more than seven million gallons of sewage each day, but the system ________________________________ **As of May 15, 2024 this project has not yet been awarded. A timeline for award has not yet been established. Grass Island Wastewater Treatment Plant Primary Settling Tanks and Miscellaneous Improvements Project no. 20-7090 Contract no. 7090 1. Primary Settling Tanks Modifications a. Perform miscellaneous demolition work. b. Remove Primary Settling Tank Nos. 1 thru 5 longitudinal collectors, drives and associated components including motor starters in MCC. c. Remove Primary Settling Tank Nos. 1 thru 5 screw conveyor cross collectors, drives and associated components including motor starters in MCC. d. Provide new Primary Settling Tank Nos. 1 thru 5 longitudinal collectors, drives and associated components including vendor control panels. e. Provide new Primary Settling Tank Nos. 1 thru 5 screw conveyor cross collectors, drives and associated components including motor starters in MCC. f. Perform miscellaneous structural repairs in and around Primary Settling Tank Nos. 1 thru 5. g. Paint Primary Settling Tank Nos. 1 thru 5 with protective epoxy coating. h. Integrate system controls with new plant SCADA system. i. Provide electrical power and control and instrumentation equipment, conduits and cable for interconnecting of power and controls. j. Replace existing stairway, located between Influent Distribution Chamber 1A & 1B, with new concrete platform. k. Construct new bypass chamber to the south of Influent Distribution Chamber 1A. Provide 48" diameter opening between existing wall and new chamber. Steps, grating, and other structural elements should be added to access the walkway of the Primary Settling Tanks. l. Extend and modify existing 48" diameter plant influent line to discharge into new bypass chamber along with Influent Distribution Chamber 1B. m. Install (3) Slide Gates to the distribution chambers and bypass chamber. n. Reroute existing 16" sludge overflow line discharging into Influent Distribution Chamber 1B to avoid conflict with new 48" plant influent line. o. Relocate section of existing 4" Mixing Air header to avoid conflict with the new bypass chamber. p. Replace all 4" air supply drop legs, supports, diffusers, butterfly valves, and all other associated components within Influent Distribution Chambers 1A and 1B. q. Replace effluent weirs. r. Reroute section of existing 8" primary scum line to avoid conflict with new bypass chamber and new 48-inch bypass piping. s. Replace section of existing 4" and 6" Mixing Air site piping. t. Provide new access hatch over existing scum well. Inspect existing scum well and provide recommendations for repair and rehabilitation. 2. Primary Sludge and Scum Pumps Modifications a. Perform miscellaneous demolition work. b. Remove Primary Sludge Pump Nos. 1 thru 5 and motors and associated components including motor starters in MCC. c. Provide new Primary Sludge Pump Nos. 1 thru 5 and motors and associated components including motor starters in MCC. d. Remove Primary Scum Pump and motor, grinder, and associated components including motor starter in MCC. e. Provide new Primary Scum Pump and motor, grinder, and associated components including motor starter in MCC. f. Remove Primary Sludge and Scum Pump suction and discharge piping, valves and associated components. g. Provide new Primary Sludge and Scum Pump suction and discharge piping, valves and associated components. h. Remove Primary Sludge Pump control panel. i. Provide new Primary Sludge and Scum Pump PLC based control panel. j. Paint all new Primary Sludge and Scum Pump suction and discharge piping, valves and associated components. k. Integrate system controls with new plant SCADA system. l. Provide electrical power and control and instrumentation equipment, conduits and cable for interconnecting of power and controls. 3. Headworks Building Transfer Switch Replacement a. Replace both transfer switches located within the distribution switchgear. b. Prepare MOPO for circuit breaker installation. 4. Miscellaneous a. Prepare detailed Maintenance of Plant Operations Plan that describes the proposed means and methods to perform the Primary Settling Tanks and Primary Sludge and Scum Pumps modifications. b. Replace drainage piping located above the area where the Primary Sludge and Scum Pumps are located. c. Perform miscellaneous concrete repair work to the ceiling above the area where the Primary Sludge and Scum Pumps are located. The foregoing is a general outline of Work only and shall not be construed as a complete description of Work to be performed under the contract. A Bid Bond for 5% of the bid amount must accompany each bid. Bidders may be required to submit data covering financial resources, equipment and ability to perform the work rapidly and in a satisfactory manner. The right is expressly reserved to reject any or all bids, to waive any informalities in the bids, or to accept such bids as appear to be in the best interest of the Town.

Post-Bid

Water / Sewer

$1,000,000.00

Public - City

Site Work

129

27

7

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
866
Active Projects
503
Bidding Soon
6,856
All Active Projects
2,797
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2024

May 13, 2024

May 13, 2026

img_map_placeholder

To Be Determined, Greenwich, CT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.