BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of an educational facility in Fayetteville, Arkansas. Completed plans call for the construction of a educational facility; and for site work for a educational facility.

https://www.nwaonline.com/news/2024/may/23/university-of-arkansas-trustees-ok-residence/ University of Arkansas trustees OK residence halls’ designers, contractors __________________ The University of Arkansas Fayetteville, in accordance with the policies of the Board of Trustees, is soliciting responses from qualified firms to provide general contractor construction management services for new residence halls in the Maple Hill district - central and north sites Background. In August 2023, the university hired a consultant team to conduct a needs assessment for student housing on campus. The University Housing Growth Study, completed in February 20241 , is intended to help the university better position its student life offerings in the face of enrollment growth that has outpaced the university's ability to accommodate students in on-campus housing. Among its other conclusions, the study identified a current undergraduate demand for over 2200 additional beds, with an immediate need to build over 1200 beds for freshmen. Based on market-tested room rates and a survey of student preferences, the study recommended the new beds be configured as traditional double rooms with communal baths. In concert with university staff, the consultant team studied several sites to see how these initial beds could be accommodated within the existing scale and character of campus. Two sites in the Maple Hill district were selected that can potentially hold up to 1400 beds, depending on building configuration, height, amount of common space, student amenities, etc. Two projects. In order to effectively manage the scale and complexity of design and construction, as well as respond to the differing challenges of the two sites, the university will select two design and construction teams for separate projects--one project at Maple Hill central site and another at Maple Hill north site. Based on site characteristics and funding constraints, the university will develop up to 1400 beds across the two sites. While the two are separate projects, the design and construction of both will run roughly in parallel so that the university can determine the best balance of student rooms and amenities between the two projects. The sites. The Maple Hill district sits at the northwest corner of central campus, and holds several academic buildings, the university health center, a dining hall, and nine residence halls totaling 2557 beds. Maple Hill central site is located centrally within the district, bordered on the north and east by a series of four-story residence halls, and on the south by the John W. Tyson Building, a large academic building that faces away from the residence halls. The project site slopes steeply down from northeast to southwest, where it meets the upper reach of Mullins Creek, an ephemeral stream that leads down into Athletic Valley. Estimates for the total project costs for both projects, shown below, were developed as part of the University Housing Growth Study, and represent a potential range based on the number of beds, to be vetted during the design process: Maple Hill central site: $127-135 million General contractors and design consultants will work with a university building committee, an independent third-party commissioning agent, and Facilities Management to advance campus master planning and design principles, as well as sustainability requirements. interviews of shortlisted firms April 9 Board of Trustees selection announced May 23 contract negotiations June-July 2024 design starts August 2024 construction starts August 2025 project complete May 2027 The University of Arkansas Board of Trustees has expressed a clear preference for construction teams that include an Arkansas contractor. Please note that this will be considered during the selection process. Format requirements: Printed responses should be no larger than 8.5in x 11in, limited to 50 sheets maximum (100 pages), fully recyclable (i.e. no plastic covers, plastic tabs, etc.) and bound with glue, staples, or thread (i.e. perfect bound, saddle stitching, etc.). No metal or plastic coils allowed. Responses that do not meet these requirements will be disqualified. Please send a digital copy of the response via email to kristenk@uark.edu in addition to the printed booklets. To avoid potential conflicts of interest, respondents should not communicate with university faculty or staff about this project. This document provides the relevant information for assembling a Statement of Qualifications. If you have questions about the selection process or the project scope, you can send them via email to kristenk@uark.edu. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Educational

$135,000,000.00

Public - City

New Construction, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
107
Active Projects
68
Bidding Soon
819
All Active Projects
382
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 19, 2024

August 1, 2025

May 31, 2027

img_map_placeholder

1260 W Maple St, Fayetteville, AR

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.