BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 16, 2024 at 8:00 PM

Updated May 17, 2024

Site work for a water / sewer project in Denton, Texas. Completed plans call for site work for a water / sewer project.

The deadline to ask questions is 3/25/2024 5:00 PM CDT, Questions shall be submitted to the Engineer via CivCast. Document Notes : The documents may be viewed, downloaded, printed, or purchased by interested contractors and/or suppliers. Online purchase price will be dependent on product ordered (full size plans, individual sheets, half size plans, and project manuals). Prospective Bidders must register with the procurement website as a plan holder, even if the contract documents are obtained from a plan room or other site. All official notifications, addenda, and other documents will be offered only through the procurement website. This project includes construction of approximately: o 6,130 LF - 8" C900 PVC Water Line (Open Cut) o 70 LF - 8" C900 PVC Water Line (By Other Than Open Cut) o 50 LF - 6" C900 PVC Water Line (Open Cut) o 1,060 LF - 2" Polyethylene SDR-9 Water Line (By Other Than Open Cut) o 5 - 12" Gate Valve o 22 - 8" Gate Valves o 8 - 6" Gate Valves o 3 - 2" Gate Valves o 8 - Fire Hydrants o 126 - Services. Each bid shall be accompanied by a proposal guarantee in the form of a cashier's check, a certified check, or an acceptable bid bond in an amount of not less than five percent (5%) of the total amount of the base bid, made payable without conditions to "Trophy Club Municipal Utility District No. 1", and the amount of the said Bid Bond may be retained by and forfeited to the District as liquidated damages if the bid covered thereby is accepted and a contract based thereon is awarded and the bidder should fail to enter into a contract in the form prescribed, with legally responsible sureties and required insurance coverage acceptable to the District's Legal Counsel, within fifteen (15) days after such award is made by the District. The Bid Bond of the unsuccessful bidders will be returned if and when their bids are rejected. The Bid Bond of the bidder to whom a contract is awarded will be returned provided the bidder executes a contract and files the required bonds and insurance. The Bid Bond of the second and third lowest responsible bidders may be retained for a period of time not to exceed sixty (60) days after the contract is awarded pending the execution of the contract and bonds by the successful bidder. The District reserves the right to disapprove any subcontractor. The Contractor shall not change subcontractors or enter into contracts with subcontractors not listed without prior approval by the District. The District reserves the right to refuse any or all requests for changes.

Award

Water / Sewer

$1,679,179.00

Public - City

Site Work

26

7

8

Subscribe For Documents

72 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
440
Active Projects
256
Bidding Soon
3,769
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 1, 2024

May 31, 2024

Project location map

Multiple Locations, Denton, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.