BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Piqua, Ohio. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; and water / sewer project.

-Removal of the old catch basin 6' by 11' at the storm drain in the center of the property. The 6' by 11' area is to be saw cut (using previous saw-cut joints), and the existing precast concrete catch basin is to be up to remove the old compacted stone. -Once the catch basin is removed. Next, the vendor will need to install a new precast concrete catch basin, which will be placed on the new compacted stone and then backfilled with new compacted #304 stone and a minimum of 4" of compacted PG64-22 asphalt. The existing stormwater pipes are to be fitted back into the new catch basin and sealed around the existing stormwater pipes so that groundwater does not flow between the pipes and the catch basin. -The new 4" asphalt will be placed and compacted in 2" lifts. The perimeter of the patch is to be crack-sealed. (Please see additional information attached) -Finally, once the catch basin is completed, the whole post parking lot will need a Crack seal, seal coat, and stripe. Question Deadline 03/13/2024 at 10:00 AM ET Pre-Bid Meeting: No Meeting The time for Substantial Completion of all Work is 120 consecutive days from the Commencement Date in the Notice to Proceed. Any questions regarding project scope or bid process please contact: Mike Morehouse Construction Project Specialist 1, Ohio Department Public Safety 1970 West Broad Street, Suite 428 Columbus, Oh 43223 614-387-1419 mdmorehouse@dps.ohio.gov Prevailing Wage rates are applicable to this project, if the bid exceeds $75,000. EDGE participation is only required for bids exceeding $50,000. Participation should include 5% of the full bid amount including labor and materials. EDGE vendors can include labor and material suppliers. Bond - Bids exceeding $50,000 require a bond with Power of Attorney for the full amount of your proposal. Full depth repair Saw cut and move existing asphalt Compact base material with a vibratory compactor or roller if large enough repair area Replace with a minimum of 4 inches of compacted PG64-22 compacting a maximum of 2 inches per lift. Some of the base and sub-base material may need to be removed and replace with compacted base material to fit 4 inches of compacted asphalt. Seal all repair edges with 3405 hot pour crack seal. Oerlays Crack seal existing cracks larger than % inch Asphalt adjacent to curbs, aprons, etc. are to milled a minimum of 1.50 inches deep and 12 inches wide. Tack coat is to be applied on existing asphalt before paving. Existing grades are to be maintained. Do not create ponding. The overlay is to be a minimum of 1.25 inches compacted.

Award

Sidewalks / Parking Lot

$24,800.00

Public - County

Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

4

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
241
Active Projects
126
Bidding Soon
2,741
All Active Projects
1,170
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 18, 2024

April 17, 2024

August 19, 2024

img_map_placeholder

401 US-36, Piqua, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.