BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Make some green this Black Friday.

Subscribe for the Commercial Construction data you need to get and stay ahead of the competition.

Site work for a mixed-use development in Wildwood, Missouri. Conceptual plans call for site work for a educational facility.

The Rockwood School District invites you to submit a bid according to the requirements contained herein for premises identification stripe painting. It is anticipated the services will commence on May 28, 2024 and continue through August 2, 2024. The Contractor shall paint a solid color stripe representing the designated zone that shall be applied on the walls on both sides of the applicable corridor(s). The stripe shall be no less than 4” above finished floor (AFF). No more than 36” AFF, and a minimum of 4 inches (102 mm) in width. The stripe shall be continuous in the length of the corridor and terminate at the exit or the transition to a different zone. (In corridors with lockers, displays, or other fixed obstructions, an alternative location may be used as approved by the District.) Exhibit A lists the total feet in length of each hallway with the type of Sherwin Williams paint to be used in each school.

Project Abandoned

Roads / Highways

$150,000.00

Public - County

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
57
Bidding Soon
800
All Active Projects
294
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

May 28, 2024

img_map_placeholder

Multiple Locations, Wildwood, MO


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.