Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 9, 2024 at 8:00 PM

Updated April 10, 2024

Site work for a municipal facility in Seattle, Washington. Completed plans call for site work for a municipal facility.

A. This item of work shall consist of, but is not limited to, work and operations necessary for the movement of personnel, equipment, material and supplies to and from the project site for work on the project except as provided in the contract as separate pay items. B. Mobilization also includes erecting a security fence; installing temporary utilities to the staging area(s); establishing a site field office; establishing haul roads; and other facilities necessary for the performance of the Work. Demobilization includes removal of all items above, as well as clean-up and restoration of the construction staging areas. C. Mobilization limit. Mobilization shall be limited to 10 percent of the total project cost. There is a 15% minimum Apprentice Utilization Requirement on this contract. There is a 15% minimum Small Business Enterprise (SBE) Requirement. Brief Scope: Work includes installation of new in pavement runway guard lights, replacing existing elevated runway guard lights with LED lighting at Taxiway Bl, B5 and B10; installation of a new ALCMS system in the Electrical Vault and Air Traffic Control Tower including trenching and new cabling between; and miscellaneous marking obliteration and painting for temporary and permanent markings. Estimated contract price: $2,419,222

Post-Bid

Municipal

$2,419,222.00

Public - County

Site Work

8

10

3

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
266
Active Projects
119
Bidding Soon
2,057
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 2, 2024

June 3, 2024

Project location map

Multiple Locations, Seattle, WA

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed