BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work, paving and new construction of a bridge / tunnel in Columbus, Ohio. Completed plans call for the demolition of a bridge / tunnel; for the construction of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Alton & Darby Creek Road 1.88 over Clover Groff Ditch in Prairie Township, Franklin County, Ohio. EBE Goal: 6% Construct a complete bridge replacement of the existing Alton & Darby Creek Road over Clover Groff Ditch structure to accommodate future pedestrian mobility improvements. Widening of Alton & Darby Creek Road to extend a southbound left turn lane and widening Feder Road to add a westbound right turn lane. Proposals must contain the name of every person interested therein and shall be accompanied by a bid guaranty and contract bond for the full amount of bid; or in lieu of the bid guaranty and contract bond the bidder may submit a bid guaranty as provided by Section 153.54 of the Revised Code in the form of a certified check or cashier's check. The amount of the certified check or cashier's check shall be equal to ten percent (10%) of the bid. The certified check or cashier's check submitted with a bid will be held as a guarantee on an accepted bid proposal The contract will be awarded within 60 days of the bid opening date. At that time, a bid guaranty and contract bond in the sum of 100% of the bid plus all add alternates shall be executed in accordance with Section 307.89 of the Revised Code of Ohio. Bidders Are Required to Be Pre-qualified With the Ohio Department of Transportation To Submit a Bid for This Project The work shall be completed no later than November 15, 2024. Upon failure to complete the work within the time specified, the Contractor shall be governed in accordance with Section 5555.67 of the Revised Code of Ohio. No proposal shall be considered unless it complies with all the rules and regulations set forth in the Contract documents. All bidders are urged to carefully read the same and comply with them. The Board of County Commissioners reserves the right to reject any or all bids Allows zero unit prices and labor No Allows negative unit prices and labor No

Bid Results

Bridges / Tunnels

$1,408,908.00

Public - County

Demolition, New Construction, Paving, Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
129
Active Projects
62
Bidding Soon
1,302
All Active Projects
580
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 12, 2024

May 13, 2024

img_map_placeholder

Alton Darby Creek Rd, Columbus, OH


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.