BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in Coon Rapids, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 22, 2024, project was awarded to NORTHWEST ASPHALT COMPANY, in the amount of $5,025,239.11.** Reclaim Bituminous Surface, 46,987 SY; Remove Watermain, 11,600 LF, Remove and Replace Hydrants with Valves, 21 EA; Remove and Replace Valves, 21 EA; Remove Bituminous Surface 46,857 SY; Bituminous Non / Wear Course, 8,800 TON; New Storm Sewer Structures, 26 EA; Storm Sewer Pipe, 1,300 LF; 6"/8"/10" PVC Watermain 11,300 LF; 6" DIP Watermain 300 LF; 1" Corp/Curb Stop with Box 179 EA; Concrete Curb, 26,500 LF; 6" /8"Concrete Driveway Apron, 20,300 SF; Temporary Mailbox 179 EA; Street Signs, 179 EA; 1,000 Pavement Striping; and other necessary appurtenances. If the Contract is awarded by the City Council on April 2, 2024, it is anticipated that construction on this Contract could begin on May 6, 2024. A neighborhood meeting shall be held in Woodcrest Park (901 103rd Avenue NW) on Wednesday, April 24, 2024, from 5:00 to 6:30 p.m., and shall be attended by City staff, as well as the Contractor site foreman and superintendent. The purpose of this meeting is to inform residents of the intended construction schedule and introduce key Contractor and City representatives. The Contractor shall be given until September 13, 2024 (Final Completion) to complete all work on this project. Final completion is defined as complete installation of the asphalt wearing course pavement throughout all project areas. Permanent signing and striping installations and sawing and sealing operations are acceptable after the final completion date of September 13 but shall be complete no later than September 27, 2024. Please save this letter for your records. If you have any questions about permit coverage for this project, please contact the Construction Stormwater Program at 651-757-2119 or toll free at 800-657-3804.

Award

Roads / Highways

$5,025,239.00

Public - City

Paving, Site Work

3

19

4

7

Subscribe For Documents

54 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
121
Active Projects
82
Bidding Soon
773
All Active Projects
316
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 25, 2024

May 6, 2024

img_map_placeholder

Multiple Locations, Coon Rapids, MN

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.