Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published May 2, 2024 at 8:00 PM
Updated October 1, 2024
Site work for a development in Alturas, California. Completed plans call for site work for a development.
127EAW24R0009 - Modoc Forest Barrack Maintenance Modoc National Forest FAR 32.204 Disclosure of Magnitude of the Construction Project: Between $500,000 and $1,000,000 Set Aside: Total Small Business Set Aside IMPORTANT NOTES: See Section L, Paragraph L.2 for the Documents to Submit with Your Proposal All Requests for Information (RFI's) shall be submitted to the Contracting Officer, Greg Cunningham, on the attached RFI form not later than 1300 hours PST, April 10th, 2024. An organized site visit will be held on Tuedsay, April 2nd, 2024, 8:30 AM PST. See page 22 of the solicitation document for full details. In no event shall failure to inspect the site constitute grounds for a claim after contract award. PLEASE RSVP TO THE SITE VISIT BY EMAILING: GREGORY.CUNNINGHAM@USDA.GOV *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The purpose of this project is to renovate all barracks located on the Modoc National Forest due to being outdated. This includes but is not limited to roofing, exterior siding, windows, flooring, interior painting, bathroom renovation, propane refrigerators, cabinets, countertops, HVAC, wood stoves, LED lighting, HAZMAT mitigation. The Contractor should refer to the SCHEDULE OF ITEMS and project plans and specifications when making estimates of quantities or work. The Contractor shall be responsible for providing all labor, tools, material, and equipment necessary to perform all work in strict accordance with the specifications, drawings and industry standards. Payment for contract work will be made only for and under those pay items included in the Schedule of Items. All other work and materials will be considered as incidental to and included in the payment for the items shown
Post-Bid
Conservation and Development
$1,000,000.00
Public - Federal
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Division 01 - General Requirements
Division 02 - Existing Conditions
Division 04 - Masonry
Division 05 - Metals
Division 07 - Thermal and Moisture Protection
Division 09 - Finishes
Division 10 - Specialties
Division 12 - Furnishings
Division 22 - Plumbing
Division 26 - Electrical
Division 28 - Electronic Safety and Security
Division 34 - Transportation
Division 35 - Waterways and Marine Construction
Division 41 - Material Processing and Handling Equipment
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 23, 2024
June 3, 2024

225 West 8th Street, Alturas, CA
Related To This Project
Alturas, CA
Bid Date: Apr 09 2024
Alturas, CA
Bid Date: May 28 2024
Alturas, CA
--
Alturas, CA
Bid Date: Jul 10 2024
Alturas, CA
Bid Date: Oct 08 2024
Alturas, CA
Bid Date: Sep 18 2024
Alturas, CA
Bid Date: Oct 28 2024
Alturas, CA
Bid Date: Jan 27 2025
Alturas, CA
Bid Date: Feb 28 2024
Alturas, CA
Bid Date: May 21 2024
Alturas, CA
--
Alturas, CA
Bid Date: Jan 09 2024
Alturas, CA
Bid Date: Jan 23 2024
Alturas, CA
Bid Date: Jan 10 2024
Alturas, CA
Bid Date: Jan 24 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Unlock Efficiency: The Future of Commercial Construction is Data-Driven
Sign up now to get free company and project data. No payment required.
.webp)
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
.webp)
Upgrade now for industry‑leading commercial construction data.
You've reached the free-view limit.
Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.