BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a mixed-use development in Memphis, Tennessee. Completed plans call for the renovation of a laboratory facility.

The SCBE requests bids for John P Freeman K-8 Stem Lab. The specifications are contained in the Design Project Manual. Responses submitted must meet or exceed all requirements. Bids that do not meet or exceed all requirements will be considered non-responsive. Scope of work includes, but not limited to, Electrical work, painting, floor replacement, lighting upgrade, equipment removal, cabinet demolition, and removal of fume ventilation hood. BID BOND: Bidders are required to submit a bid bond in the amount of five percent (5%) of the total estimated contract amount for each individual school location, as determined by SCBE and specified in the IFB, to ensure the satisfactory completion of the work for which a contract or purchase order is awarded that may exceed $100K. Should the Bidder withdraw their bid response without entering into a contract the Bid Bond may be forfeited in whole or in part. PERFORMANCE AND LABOR BOND: The successful Bidder(s) will be required to submit a performance and/or labor bond, Cashiers or Certified Check in the amount of one hundred percent (100%) of the total estimated contract amount for the school location, as determined by SCBE and specified in the IFB, to ensure the satisfactory completion of the work for which a contract or purchase order is awarded. The successful Bidder accepts this contract with the understanding that should they fail to complete the work/delivery in an acceptable manner and in the time stated, shall be subject to the payment of liquidated damages as stated in the bid document. Liquidated damages for this project are as follows: $500.00 /per day substantial completion deadline missed, and $500.00/per day completion deadline missed. The anticipated terms of this contract shall be 12 weeks. The work shall begin after issuance of the Notice to Proceed. Estimated start time is 09/16/2024. The substantial completion date is 11/13/2024 and a final completion date of 12/13/2024. The SCBE reserves the right to exercise its statutory option to reject any or all bids and re-advertise for other bids. The SCBE reserves the right to order the said equipment, materials, supplies or services as described within the specifications, and the SCBE also reserves the right not to order any items(s) within the specification.

Bid Results

Laboratories

$68,228.00

Public - County

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
53
Active Projects
26
Bidding Soon
389
All Active Projects
176
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

July 30, 2024

September 16, 2024

img_map_placeholder

5250 Tulane Rd, Memphis, TN

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.