BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a mixed-use development in West Bend, Wisconsin. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and water / sewer project.

**As of April 10, 2024, the project was awarded to Vinton Construction in the amount of $1,174,963.11.** Significant types of work and approximate quantities include: Furnish and Install 8-lnch PVC Sanitary Sewer 1,115 LF Furnish and Install 12-lnch Ducitle Iron Water Main 1,210 LF Furnish and Install 12-lnch RCP Storm Sewer 725 LF Furnish and Install Bioswale 2,600 SF Furnish and Place 24-lnch Concrete Curb and Gutter 2,640 LF Furnish and Place 4-lnch Concrete Sidewalk 12,400 SF Paint Pavement Marking - 4-lnch Yellow 2,375 LF Furnish and Place Base Aggregate Dense, 1-1/4-Inch, 4-lnch Depth 2,500 TON Furnish and Place Base Aggregate Dense, 3-lnch, 8-lnch Depth 2,800 TON Furnish and Place 5-lnch Hot Mix Asphalt Pavement 1,700 TN Furnish and Place Topsoil, Seed, Fertilizer, Mulch, and Water, 6-lnch 4,750 SY Tree and Stump Removal, 6-lnch and Above 40 EA The City of West Bend, Wisconsin, reserves the right to reject any or all bids, subject to the provisions of Sections 62.15 and 66.0901 of the Wisconsin Statutes. No bid shall be withdrawn for a period of 60 days after the scheduled time of opening bids. The letting of work described herein is subject to the provisions of Section 66.0901 Wisconsin Statutes, as it applies to work done under this contract. No bid will be accepted unless accompanied by an uploaded Bid Bond or electronic Surety2000 bid bond equal to 5% of the bid, payable to the City of West Bend, Wisconsin, as a guarantee that, if the bid is accepted, the successful bidder will execute and file the contract and payment and performance assurances, forming a part of the Specifications, within 10 days after the award of the contract The payment and performance assurances must be for an amount at least equal to the contract price and must be in the form of a bond, an irrevocable letter of credit, or an escrow account acceptable to the City. In case the bidder fails to file such contract, performance bond, and payment bond, the amount bid bond shall be forfeited to the City as liquidated damages (Section 62.15(3) of Wisconsin Statutes). All questions regarding the project shall be directed to Brad Jors, P.E. of Kapur and Associates, Inc. at bjors@kapurinc.com or (414) 751-7235. Compiled and published by authority of the City of West Bend, Wisconsin.

Award

Water / Sewer

$1,174,963.00

Public - City

Paving, Site Work

32

5

2

8

Subscribe For Documents

46 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
51
Bidding Soon
834
All Active Projects
322
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

April 22, 2024

img_map_placeholder

Sand Dr, West Bend, WI


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.