BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a municipal facility in Quincy, Massachusetts. Conceptual plans call for site work for a municipal facility.

In accordance with M.G.L. Chapter 30B and all other relevant procurement laws and guidelines, The City of Quincy acting on behalf of the Office of the Mayor, is soliciting proposals for the design, fabrication, and installation of a monumental sculpture(s) to enhance the landscape at a place to be determined by the City. The goal is to design a monument about the significance of the Massachusett Tribe at Ponkapoag and improve the aesthetic landscape with appropriate monument(s) and other designed enhancements. The project is being completed in conjunction with the expansion and renovation of the Squaw Rock area. The selected artist will work with the City and a designated design committee of the Massachusett Tribe to complete the 100% designs, construction, and installation of the sculpture(s) to be placed at a space determined by the City. All inquiries must be received via email to klogan@quincyma.gov and cc: mmarini@quincyma.gov thru March 22, 2024 by 12:00 p.m. The City of Quincy shall determine the selected artist through a standard panel-based artist selection process. The City of Quincy reserves the right to withdraw the Request for Proposal; to reject any and all submittals; and to accept any submittals deemed to be in the best interest of the City of Quincy. Bids shall be in accordance with any and all M.G.L. Chapter 30B. All Federal, State and City of Quincy regulations will apply. The City reserves the right to waive any informality in or to reject any or all bids when such an action is deemed in the best interests of the City. The City of Quincy reserves the sole right to amend this RFP by formal Addendum. The overall project budget range established by the City of Quincy for the project is $400,000.00 - $600,000.00 for the completion of the project as described. The budget must cover all aspects of the project including the artist fees, fabrication costs, insurance, installation and all other related expenses. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Conceptual

Municipal

$600,000.00

Public - City

Site Work

We’ve obtained documents for this project and are currently processing them.

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
281
Active Projects
139
Bidding Soon
2,604
All Active Projects
1,060
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 1, 2024

img_map_placeholder

To Be Determined, Quincy, MA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.