BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and new construction of a pre-engineered storage facility in Golden, Colorado. Completed plans call for the construction of a 388-square-foot pre-engineered storage facility.

This project requires preparation of an approximate 15'5" x 25' site with 3"-4" of 3/4" rock enclosed with Windsor wall and installed with utility hook-ups for both electrical and plumbing. The structure requires faux stone to match historical requirements of existing buildings nearby. Installation is under windows to bottom of kennel around all sides with exception of fenced kennel areas. Estimated materials; (MUST BE VERIFIED BY CONTRACTOR & SUB-CONTRACTORS) rock, stone facade, Windsor retaining wall block, electrical and plumbing hook-ups. as needed. A bid security of not less than 5% of the bid price is required when the price is estimated to be $50,000 or more. The security shall be a bond by a surety company, the equivalent in cash, or otherwise supplied in a form satisfactory for the State. Noncompliance requires the bid to be rejected as nonresponsive.

Post-Bid

Warehouse / Distribution - Pre-Engineered Storage Building

$70,000.00

Public - State/Provincial

New Construction, Site Work

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
203
Active Projects
110
Bidding Soon
1,676
All Active Projects
711
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 8, 2024

April 8, 2024

img_map_placeholder

15075 S Golden Rd, Golden, CO


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.