Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a fire / police facility in Beloit, Wisconsin. Completed plans call for the renovation of a fire / police facility.
The work for which bids are asked includes but is not necessarily limited to, furnishing all labor, tools and equipment necessary for the VAV and controls upgrades located at 100 State St., Beloit, WI, 53511, respectively. The base bid will include approximately 22,000 SQ FT on the first floor. The work which bids are asked includes, but is not necessarily limited to, mechanical electrical, and miscellaneous items associated with the above work. The alternates are described under technical specification 01 23 00. All work will be issued under a single prime contract for general construction. SUBSTANTIAL/FINAL COMPLETION. Substantial Completion of the Work shall be achieved by 10/01/2024 . Unless otherwise specified in the Certificate of Substantial Completion, the CONTRACTOR shall achieve Final Completion by 10/15/2024 . Bid Bond payable to the City of Beloit in the amount of 5% of the Bid shall accompany each bid as a guarantee, that if the bid is accepted, the bidder will execute and file the Agreement, the Contract Performance Bond and Payment Bond, as required by the Contract Documents, within ten (10) days after the Notice of Award of the Contract by the City of Beloit. Failure of the part of the Bidder to do so will result in forfeiture of the Bidder's certified check or Bid Bond to the City of Beloit as liquidated damages. CONTRACT SECURITY: The Bidder to whom a Contract is awarded shall be required to furnish both a Performance Bond and a Payment Bond acceptable to the City of Beloit for 110% of the Contract Price for each of the above Bonds, in accordance with the requirement of the Contract Documents. The City of Beloit reserves the right to reject any and all bids, waive any informalities in bidding, or to accept the bid or bids, which best serve the interests of the City of Beloit. BID WITHDRAWAL: No bid shall be withdrawn for a period of sixty (60) days after the scheduled opening of the bids without the consent of the City of Beloit Question Deadline 03/20/2024 All Bidders must execute and file a Bidder's Proof of Responsibility Questionnaire no later than the close of business
Award
Fire / Police
$228,429.00
Public - City
Renovation
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
Sign-up for Instant Access.
Provide your information to unlock 5 active projects and companies from our commercial construction database. Free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.
March 27, 2024
May 15, 2024
October 15, 2024
100 State St, Beloit, WI
Related To This Project
Beloit, WI
Bid Date: Mar 28 2024
Beloit, WI
Bid Date: Apr 19 2024
Beloit, WI
Bid Date: Apr 16 2024
Beloit, WI
Bid Date: Apr 05 2024
Beloit, WI
Bid Date: Apr 24 2024
Beloit, WI
Bid Date: May 14 2024
Beloit, WI
--
Beloit, WI
Bid Date: Apr 09 2024
Beloit, WI
Bid Date: Mar 15 2024
Beloit, WI
Bid Date: Mar 21 2024
Beloit, WI
Bid Date: Mar 08 2024
Beloit, WI
Bid Date: Jul 10 2020
Beloit, WI
Bid Date: Mar 14 2024
Beloit, WI
Bid Date: Mar 21 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--