Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 11, 2024 at 8:00 PM

Updated April 12, 2024

Site work and paving for a mixed-use development in Coon Rapids, Minnesota. Completed plans call for site work for a road / highway; for paving for a road / highway; sidewalk / parking lot; sidewalk / parking lot; and playground / park / athletic field.

**As of April 11, 2024, the project was awarded to Aslakson's Services Inc. , with an awarded amount of $156,874.25.** Full Depth Reclamation 2,800 SY; Bituminous Trail Surfacing 400 TON; Common Excavation 200 CY; Aggregate Base Class 5 From Public Works Facility 200 CY; Select Top Soil 350 CY; Hydroseeding Hydraulic Reinforced Fiber Matrix 800 LB; Concrete Curb and Gutter 100 LF; 4" and 6" Concrete Walk ADA; Ped Ramp 400 SF; Furnish & Install Traffic Warning Sign 4 EACH; 4" Solid Line Paint 60 LF; 24" Solid Line Paint 40 LF; Cross Walk Paint 150 SF; Traffic Control 1 LUMP SUM The bids will be considered by the City Council at 7:00 p.m., April 2, 2024. The Contractor shall be given until August 16, 2024 (Final Completion) to complete all work on this project. Final completion is defined as complete installation of the asphalt wearing course pavement and concrete work throughout all project areas. Restoration and hydroseeding operations are acceptable after the final completion date of August 16 but shall be complete no later than August 30, 2024

Award

Roads / Highways

$156,874.00

Public - City

Paving, Site Work

11

5

4

5

Subscribe For Documents

23 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
240
Active Projects
102
Bidding Soon
1,719
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 22, 2024

June 3, 2024

Project location map

Multiple Locations, Coon Rapids, MN

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed