BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a bridge / tunnel in Schuyler, Nebraska. Completed plans call for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

Along With Its Bid Proposal, Each Bidder Shall Submit An Unconditional Bid Bond Or Certified Check Made Payable To The County Treasurer Of Colfax County, Nebraska, In An Amount Equal To Five (5) Percent Of The Bid Proposal. Also, Each Bidder Is To Include An Estimated Time Of Beginning And Completion For The Projects With Its Bid Proposal. The Desired Completion Date Is November 1, 2024. The Successful Bidder (I.e. Contractor) Will Be Allowed Fifty (50) Calendar Days For Completion Of Each Site After Beginning Work At The Site, Provided They Do Not Exceed Their Specified Completion Date. Additional Days Due To Weather May Be Granted At The Discretion Of The Engineer. No Project Can Be Started Without The Intent To Complete That Site Without Delay From The Other Sites, Therefore, The Contractor Will Not Be Allowed To Start The Removals At A Site Unless They Have Committed A Crew To Complete The Work At That Site. Within Ten (10) Days Following The Award Of The Contract, The Successful Bidder Shall Furnish A Surety Bond Or Bonds In An Amount Equal To Or Greater Than The Full Amount Of The Contract. The Surety And Form Of The Bonds Are Subject To Acceptance By The Colfax County Board Of Commissioners. The Colfax County Board Of Commissioners Reserves The Right To Reject Any And All Bids Or To Waive Any Irregularities In Bids Received. Award Of The Contract Will Be In Accordance With The County Purchasing Act's Competitive Bidding Considerations As Set Forth In Neb.rev.stat. The Project Is Referred To As "colfax County 2024 Cbc's: C-19(567), C-19(568) & C-19(569)" And Shall Include All Labor, Materials, Transportation And Equipment Required For The Construction Of: C-19(567) - Triple 12' X 10' X 40' Concrete Box Culvert On A 0 Degree Skew; C-19(568) - Twin 9' X 12' X 40' Concrete Box Culvert On A 0 Degree Skew And C-19(569) - Triple 12' X 12' X 40' Concrete Box Culvert On A 0 Degree Skew, And Other Related Incidental Work. The Construction Of Three (3) Concrete Box Culverts, Roadway Grading And Other Related Incidental Work. The Project Sites Are Located As Follows: C-19(567) - On Road Y Between Road 7 And Road 8; C-19(568) - On Road Q, Between Road 18 And Road 19 And C-19(569) - On Road 10, Between N And Road O, All In Colfax County, Nebraska.

Award

Bridges / Tunnels

$764,906.00

Public - County

Paving, Site Work

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
65
Active Projects
51
Bidding Soon
535
All Active Projects
269
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 26, 2024

img_map_placeholder

Multiple Locations, Schuyler, NE

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.