Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a civil project in Pleasant Grove, Utah. Completed plans call for site work for a road / highway; for paving for a road / highway; and water / sewer project.
This project will inlclude about 5570 linear feet of C-900 water line instalation, about 3,150 ft of pavement section replacement, fire hydrants, and service line replacements. East of Murdock Canal Trail: Approximately 3,150 feet of 8" PVC C900 water main and fittings at an average bury depth of 4 feet to top of the pipe, including valves, fittings, water services, irrigation services, fire hydrants, and sampling station. Includes removal and rehabilitation of approximately 12,100 square yards of roadway asphalt and road base. Includes removal and disposal of existing a Pressure Reducing Vault (PRV). West of Murdock Canal Trail: Approximately 2,420 feet of 8" PVC C900 water main and fittings at an average bury depth of 4 feet to top of the pipe, including valves, fittings, water services, irrigation services, fire hydrants, and sampling station. Includes cutting and patching asphalt approximately 1,422 square yards of roadway asphalt and road base. Question Submission Close Date 3/26/2024 5:30 PM MDT
Award
Roads / Highways
$1,905,619.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 2, 2024
May 2, 2024
S Nathaniel Dr, Pleasant Grove, UT
Related To This Project
Pleasant Grove, UT
Bid Date: Apr 17 2024
Pleasant Grove, UT
Bid Date: Apr 03 2024
Pleasant Grove, UT
--
Pleasant Grove, UT
Bid Date: Apr 30 2024
Pleasant Grove, UT
Bid Date: Jul 09 2024
Pleasant Grove, UT
--
Pleasant Grove, UT
--
Pleasant Grove, UT
Bid Date: Aug 08 2024
Pleasant Grove, UT
Bid Date: Mar 13 2024
Pleasant Grove, UT
Bid Date: Mar 22 2024
Pleasant Grove, UT
Bid Date: Mar 26 2024
Pleasant Grove, UT
Bid Date: Mar 13 2024
Pleasant Grove, UT
--
Pleasant Grove, UT
Bid Date: Jan 08 2024
Pleasant Grove, UT
Bid Date: Dec 20 2023
Recently Viewed
--
--
--
--
--
--
--
--
--
--
The best commercial construction data available. Period.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.