BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Demolition, site work and paving for a mixed-use development in Newport, Rhode Island. Completed plans call for the demolition of a military facility; for site work for a military facility; water / sewer project; sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The project will be prepared in two packages, under one contract. Package 1: Building 686 Conolly Hall Upgrades, NWC The Conolly Hall Building 686, NWC, located on the NAVSTA Newport, Rhode Island campus, is a seven level tall structure constructed in 1974 and is comprised of two (2) parking levels (P-1, P-2), four (4) levels of classroom, multi-function and administrative use and MEP/Penthouse/Roof. Base Bid: The project will include the repair and renovation to 80,000 square feet (SF) of the basement level and all upper levels of the building interiors, provide upgrades to 60,000 SF of lower parking levels, life safety and fire protection systems, and lighting. Repairs and renovations to the building include full demolition of all interiors, to face of existing exterior wall including hazardous material abatement and incidental related work, all new interior floor plan layout with architectural upgrades and finishes, new mechanical, electrical, plumbing and toilet rooms, life safety, fire alarm & protection systems, and physical and cyber security systems to meet current building codes. The projects require Third Party Certifications - refer to all specifications. OPTION 1: The project scope of work is to replace in-kind exterior window systems and exterior door and frames including hazardous material abatement and incidental related work. B686 Conolly Hall building will not be occupied during performance of work under this contract. Package 2: Modular Buildings to support Building 686 during construction The modular buildings are required to support Package 1 Building 686 Conolly Hall Upgrades during construction. The project will provide and install modular buildings, and all required site demolition, utilities, and storm water management construction for the duration of construction contract for scope of work noted in Package 1. The modular buildings are proposed to be located in existing northern and eastern parking lot areas around Building 29- Sims Hall, NWC. The northern one-story modular building is about 14,500 SF and holds fourteen (14) classrooms with proposed adjacent handicapped parking lot and building accessibility. In the existing eastern parking lot, the project includes providing and installing three additional one-story modular buildings, each about 2,800 SF to hold two (2) classrooms and offices. Each are served by a proposed adjacent handicapped parking lot. The modular buildings' exteriors are constructed of vinyl siding with 4" reveal, and vertical vinyl siding skirt and soffit. The roofs are constructed of low-sloped membrane. The scope of work for Package 2 Modular Buildings is required to be ready for occupancy, and accepted as Substantially Complete (Beneficial Occupancy Date) by the Contracting Officer prior to start of mobilization and demolition of scope of work noted in Package 1- B686 Conolly Hall Upgrades. The scope of work includes demobilization of Package 2 Modular Buildings after the scope of work noted in Package 1 B686 Conolly Hall Upgrades has been accepted as Substantially Complete (Beneficial Occupancy Date) by the Contracting Officer. The Contractor shall begin performance within 15 calendar days and complete it within 1123 calendar days the magnitude of construction for this project is between $25,000,000 to $100,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Post-Bid

Military

$100,000,000.00

Public - Federal

Demolition, Paving, Site Work

57

63

113

4

Subscribe For Documents

21 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
533
Active Projects
328
Bidding Soon
3,935
All Active Projects
1,676
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

September 10, 2024

November 12, 2024

September 23, 2027

img_map_placeholder

690 Peary St, Newport, RI


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.