BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 22, 2024 at 8:00 PM

Updated April 30, 2024

Site work and paving for a road / highway in Essex Junction, Vermont. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The contract generally includes the following work items on West Hillcrest Road, Prospect Street, Cherry Street, Cherokee Avenue, Cree Avenue, Iroquois Avenue, and Abnaki Avenue: 1) Supply and Install approximately 1095 tons of Type IV Bituminous Concrete Pavement, Overlay 2) Cold Plane approximately 2290 sy of existing pavement up to 1-1/2" thick 3) Grinding approximately 520 sy of Existing Driveway Fillets up to 1-1/2" thick. 4) Adjust approximately 33 Structure Cover/Grate Elevations 5) Provide Traffic Control Packages All work will be in accordance with Drawings, Specifications and other Contract Documents and information prepared by the City of Essex Junction, 2 Lincoln Street, Essex Junction, Vermont. BID GUARANTY: Each bid shall be accompanied by an acceptable form of Bid Guaranty in an amount equal to at least five percent (5%) of the amount of the Bid, payable to the City of Essex Junction, as a guaranty that if the Bid is accepted, the Bidder will execute the Contract and file acceptable Performance, Labor, and Material Payment Bonds within ten (10) days after the award of the Contract. Acceptable form for a Bid Guaranty is either a bid bond or certified check. No bidder may withdraw his bid within 30 days after the actual date of the opening thereof. The owner reserves the right to waive any informalities and to reject any or all bids. CONTRACT TIME: If awarded the Contract, the Contractor agrees to complete the work in its entirety, as shown on the Contract Plans. All work will be in accordance with Drawings, Specifications and other Contract Documents and information prepared by the City of Essex Junction, 2 Lincoln Street, Essex Junction, Vermont. The anticipated contract start date for the project is July 1, 2024 and all work shall be completed on or before August 16, 2024. There are no exceptions to this schedule. OBTAINING CONTRACT DOCUMENTS: Digital Drawings, Specifications, and other Contract Documents may be obtained by emailing Jeffrey P. Kershner, P.E., President, Donald L. Hamlin Consulting Engineers, Inc. at jkershner@dlhce.com. The contract generally includes the following work items on West Hillcrest Road, Prospect Street, Cherry Street, Cherokee Avenue, Cree Avenue, Iroquois Avenue, and Abnaki Avenue: 1) Supply and Install approximately 1095 tons of Type IV Bituminous Concrete Pavement, Overlay 2) Cold Plane approximately 2290 sy of existing pavement up to 1-1/2” thick 3) Grinding approximately 520 sy of Existing Driveway Fillets up to 1-1/2” thick. 4) Adjust approximately 33 Structure Cover/Grate Elevations 5) Provide Traffic Control Packages

Post-Bid

Roads / Highways

$2,000,000.00

Public - City

Paving, Site Work

11

5

2

Subscribe For Documents

2 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
346
Active Projects
160
Bidding Soon
2,164
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 11, 2024

July 1, 2024

Project location map

Multiple Locations, Essex Junction, VT

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.