Renovation of a water / sewer project in Duluth, Minnesota. Working plans call for the renovation of a water / sewer project.

**As of May 20, 2024, bids received were rejected as they were over the budget. No definite date for the rebid.** The work under this contract is to provide pad mounted liquid filled transformers for operation of the Lakewood Water Treatment Plant Power System. This equipment will be part of the upgrades to the electrical service at the Lakewood Water Treatment Plant. Please submit any questions regarding this project via e-mail to purchasing@duluthmn.gov. Responses will be issued as an addendum to this solicitation Bids must be submitted electronically through online. Bid surety in the amount of 5% of the total bid must be submitted with each bid. Bid bonds may be submitted electronically, either through Surety2000 or Tinubu within the Bid Express solicitation, or emailed to purchasing@duluthmn.gov. Paper bid bonds, certified checks or bank drafts payable to the City of Duluth may be mailed or dropped off at City Hall, 411 W. 1 st Street, Room 120, Duluth, MN 55802. Regardless of the method of submission, bid surety must be received by Purchasing prior to the bid opening. No alternatives to the specification will be considered unless specifically requested. Erasures or other changes to the bid must be initialed and dated, however no special conditions shall be made or included in the bid form by the bidder . The City of Duluth reserves the right to split the award where there is a substantial savings to the City, to waive informalities and to reject any and all bids. Price may not be the only consideration for bid award. Bids must be firm for a minimum of 60 days. The City of Duluth is an Equal Opportunity Employer. Contractor shall comply with all applicable Equal Employment Opportunity laws and regulations. This project involves furnishing all labor, work, materials, and equipment necessary: o This project will upgrade the electrical service to the Lakewood Water Treatment Plant (WTP). The work will include the construction of new electrical service, underground electrical feeders, underground fiberoptic communications cable, concrete duct back, powerhouse, medium and low voltage electrical systems, and installation OWNER furnished equipment. o Work to be included under this contract is to provide pad mounted liquid filled transformers for operation of the Lakewood Water Treatment Plant. The minimum items to be provided under this contract include: o Administration, engineering, Shop Drawing, programming, O&Ms, record drawings, and coordination with the OWNEER, ENGINEER, INSTALLATION CONTRACTOR, SCADA CONTRACTOR, POWER SYSTEM CONTRACTOR, AND TRANSFORMER PROVIDER. The work will include administration, coordination, delivery, and support installation of the standby power system. o Two 3,000 kVA 13.8kV delta - 2.4kV wye pad mounted transformer(s). Transformer(s) shall be provided without the XO-HO bond. Transformer(s) shall be provided with factory installed low voltage heater(s) with local disconnect(s) for unenergized standby service. o Three 750 kVA 480V delta - 2.4kV wye pad mounted transformer(s). Transformer(s) shall be provided with the XO-HO bond. Transformer(s) shall be provided with factory installed low voltage heater(s) with local disconnect(s) for unenergized standby service. o Three 500 kVA 2.4kV delta - 480V wye pad mounted transformers. Transformer shall be provided with the XO-HO bond. o Three 75 kVA 2.4kV delta - 240/120V delta dry-type transformers. Transformer shall be provided with the XO-HO bond. o Three 45 kVA 2.4kV delta - 208/120V delta dry-type transformers. Transformer shall be provided with the XO-HO bond. o Post installation inspection, testing, and commissioning. Question Deadline 03/20/2024 Please submit any questions regarding this project via email to Purchasing@duluthmn.gov May 1, 2024 Begin Contracts (tentative) August 5, 2024 Substantial Completion/Milestone 1 (Shop Drawings Reviewed and Equipment Released to fabrication) August 13, 2026 Substantial Completion/Milestone 2 (Delivery of Equipment and materials to site) March 11, 2027 Final Completion/Milestone 4 Questions regarding this project should be directed to: Aaron Soderlund, P.E. Senior Engineer, City of Duluth / Engineering Division, 218-730-5083, asoderlund@duluthmn.gov. Bidding questions concerning the project may be directed to: Scott R. Chilson, Principal Project Manager at MSA Professional Services, Inc., 332 W. Superior Street, Suite 600, Duluth, MN 55802, (608) 355-8868, schilson@msa-ps.com.

Final Planning

Water / Sewer

$551,000.00

Public - City

Renovation

79

16

6

7

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
23
Active Projects
14
Bidding Soon
294
All Active Projects
97
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 27, 2024

November 20, 2024

March 11, 2027

img_map_placeholder

8130 Congdon Blvd, Duluth, MN


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.