BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published July 10, 2024 at 8:00 PM

Updated July 11, 2024

Site work and paving for a road / highway in Fife, Washington. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The work involves the overlay of North Levee Road between 70th Ave E and Freeman Rd E in Fife, WA. A pre-bid meeting will not be held. The primary contact is Ken Gunther, Assistant Public Works Director, at kgunther@cityoffife.org or at (253) 922-9315 or the secondary contact is Greg Vigoren, Director of Public Works, at gvigoren@cityoffife.org or at (253) 922-9315. All bids shall be submitted on the prescribed Bid Forms and in the manner as stated in this advertisement and in the Bid Document and said bids shall be accompanied by a bid deposit in the form of cash, cashier's check, certified check, postal money order, or a surety bond to the City of Fife in the amount of five percent (5%) of the total amount of the bid. Bids submitted on other than the bond form provided by the City may be subject to rejection. Faxed bids and/or surety bond will not be accepted. The Engineer's opinion of probable construction cost is $800,000 to $1,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. The City of Fife in accordance with Title VI of the Civil Rights Act of 1964, 78 Stat. 252, 42 USC 2000d to 2000d-4 and Title 49, Code of Federal Regulations, Department of Transportation, Subtitle A, Office of the Secretary, Part 21, Nondiscrimination in Federally-Assisted Programs of the Department of Transportation issued pursuant to such Act, hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, disadvantaged business enterprises as defined at 49 CFR Part 26 will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, national origin, or sex in consideration for an award. Said check or bond will be held as a guaranty that the successful Bidder will, within ten (10) days from the date of notification of award, enter into a Contract and furnish an approved Performance Bond, on form attached, in an amount equal to one hundred percent (100%) of the amount of the Contract, including state sales tax.

Bid Results

Roads / Highways

$583,234.00

Public - City

Paving, Site Work

18

10

2

Subscribe For Documents

10 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
150
Active Projects
82
Bidding Soon
1,140
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 19, 2024

May 1, 2024

Project location map

Multiple Locations, Fife, WA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.