BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published March 30, 2024 at 8:00 PM

Updated June 15, 2024

Site work for a municipal facility in Akron, Ohio. Completed plans call for site work for a municipal facility.

Engineer Estimate is $211,259 City of Akron Local Goal: 18% EDGE/DBE/MBE/WBE/SBE/VBE (minimum 3% WBE) Project Description: The citywide painting of 1,693 hydrants, including the cleaning of hydrants prior to the painting process. Disadvantaged Business (DBE) participation goals (subcontracts, materials, supplies) have been set on this Project for those certified as DBE's in accordance with a federal agency such as the Small Business Administration or the Department of Transportation or by an approved State of Ohio agency. The Unified Certification Program (UCP) administered by the Ohio Department of Transportation (ODOT) can provide necessary DBE certifications. Domestic steel use requirements as specified in Section 153.011 of the Ohio Revised Code apply to this Project. Copies of Section 153.011 of the Ohio Revised Code can be obtained from the Ohio Department of Administrative Services. Except as provided in Section 102.07 of the City of Akron, Construction and Materials Specifications, 2008 Edition, each proposal must be accompanied by a certified check in the sum of 10% of bids on a solvent bank, or a bid bond in like amount, acceptable to the City of Akron, as a guarantee, that if the proposal is accepted, a contract will be entered into. Except as provided in Section 103.05 of the City of Akron, Construction and Materials Specifications, 2008 Edition, the Proposer to whom the Agreement is awarded will be required to furnish a performance and payment bond in the sum of 100% of the Contract Price for the faithful performance of the contract. The performance and payment bond shall remain in full effect until Final Completion of the Project. Proposals may be held by City for a period not to exceed one hundred twenty (120) days after the date Proposals are opened for the purpose of reviewing the Proposals and investigating the qualifications of Proposers prior to awarding the Agreement. The Director of Public Service reserves the right to reject any or all bids, and to waive informalities. Deadline for Questions to City March 19 by 11:00 am

Bid Results

Municipal

$203,680.00

Public - City

Site Work

18

5

6

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
234
Active Projects
105
Bidding Soon
2,087
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 27, 2024

May 6, 2024

Project location map

Multiple Locations, Akron, OH

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.