BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Longview, Texas. Completed plans call for site work for a water / sewer project.

As of May 13, 2024, this project has not yet been awarded. A timeline for award has not yet been established. If awarded by the Owner, Work under this contract includes: One (1) secondary digester: Once all three primary digesters are cleaned and returned to service, Contractor shall remove the secondary digester from service. Contractor shall provide all temporary pipe, valves, and connections to allow the Owner to bypass the secondary digester and to transfer sludge directly to the Owner's sludge presses. Contractor shall remove all sludge and contents from the secondary digester. Liquid sludge shall be transferred from the secondary digester to the Owner's sludge presses using the Owner's digested sludge pump station to the lowest level possible. Once as much sludge as possible has been transferred using the Owner's pumps, the Contractor shall provide and install temporary pump(s) to transfer any and all liquid sludge remaining in the secondary digester to the Owner's presses. Contractor shall remove all non-liquid sludge and non-sludge contents from the secondary digester. Removal of the contents of the digester includes all sludge, grit, waste, debris, trash, etc. including contents in the hopper area of the bottom of the digester. Liquid sludge shall be transferred to the Owner's presses for processing, loading, and disposal by the Owner. Non-liquid sludge and non-sludge contents shall be removed from the digester by the Contractor. Contractor shall process, load, transport, and properly dispose of all non-liquid sludge and non-sludge contents at the Owner selected landfill. Owner shall pay landfill disposal fees directly to the Owner selected landfill. Contractor shall clean the interior of the digester. Contractor shall return secondary digester to service. Primary Digesters (3x) PD 1, PD 2, PD 3: Owner will transfer liquid sludge from each of the primary digesters (one unit at a time) to the Secondary Digester (SD 1). The Owner will process the transferred sludge from SD 1 through the Owner's sludge presses lowering the level in SD 1. Owner will transport the pressed sludge to the landfill. The Contractor shall transfer the remaining sludge from each primary digester to the secondary digester (SD 1) based on the volume available in the secondary digester when transfer occurs. Owner will transfer the sludge from the secondary digester to the Owner's sludge presses (2x) via the Owner's existing digested sludge pump station. Owner's maximum transfer rate from secondary digester is approximately 70 gpm. At maximum transfer rate, Owner can lower the secondary digester at a rate of approximately 1 vertical foot (28,772 gallons) in 6.85 hours. Owner will press sludge and load into transport vehicles at the Owner's existing sludge press processing facility. Owner will transport pressed sludge to landfill under a separate contract. Owner shall pay landfill fees directly to landfill operator. Contractor shall remove contents from each primary digester. Removal of the contents of each primary digester includes all sludge, grit, waste, debris, trash, etc. including all contents in the hopper area of the bottom of the digester. Liquid sludge shall be transferred to the secondary digester for processing, loading, and disposal by the Owner. Non-liquid sludge and non-sludge contents shall be removed from each digester by the Contractor. Contractor shall process, load, transport, and properly dispose of all non-liquid sludge and non-sludge contents at Owner selected landfill. Owner shall pay landfill fees directly to the Owner selected landfill. Contractor shall clean the interior of each primary digester. Contractor shall return primary digester to service prior to removing next primary digester from service. Provide and install mag meter in existing pipe between PD and SD at Digester Control Building. Provide and install valves, pipe, and fittings between PD HEX pumps and SD at Digester Control Building. Clean existing Pipes between Digester Control Building and PD 1 and PD 2 Question Deadline 03/21/2024 , Please submit questions for this project at least five (5) days prior to bid opening through online. Time of completion shall be 150 calendar days, including Saturdays, Sundays, and legal holidays. IN CASE of ambiguity or lack of clearness stating the price in the bids, the Owner reserves the right to consider the most advantageous construction thereof or to reject the bid. The Owner reserves the right to reject any or all bids, to waive any or all informalities, and to award the contract to the bidder or bidders who, in the opinion of the Owner, offers the proposal to the best interest of same. THE SUCCESSFUL BIDDER OR BIDDERS will be required to furnish a Performance Bond, Payment Bond, and Maintenance Bond, in the amount of the contract, written by a responsible surety company authorized to do business in the State of Texas, and satisfactory to the Owner as required by Article 5160 V.A.T.C.S.

Bid Results

Water / Sewer

$918,259.00

Public - City

Site Work

20

15

2

4

Subscribe For Documents

31 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
40
Bidding Soon
745
All Active Projects
344
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

March 26, 2024

April 25, 2024

September 22, 2024

img_map_placeholder

5211 W Loop 281, Longview, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.