Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 24, 2024 at 8:00 PM

Updated May 25, 2024

Demolition, site work, paving, new construction and renovation of a mixed-use development in Wewahitchka, Florida. Completed plans call for the demolition of a fire / police facility; for the construction of a fire / police facility; for the renovation of a fire / police facility; for site work for a fire / police facility; for paving for a sidewalk / parking lot; sidewalk / parking lot; sidewalk / parking lot; and sidewalk / parking lot.

The Project consists of the repair and construction of the Fire Station previously under construction. The proposed construction includes the demolition of the existing interior slab and existing wood framing members, reconstruction of the concrete slab and interior wall framing (including a fire wall), site improvements including grading, concrete parking areas, access connections, sidewalks, landscaping, and a storm water management facility. It is the responsibility of the contractor to coordinate with the City and construct all utility service connections. Fire Station. All Bids Shall Remain Firm for a Period of Sixty Days After the Opening. All Bidders Shall Comply With All Applicable State and Local Laws Concerning Licensing Registration and Regulations of Contractors Doing Business in the State of Florida . The City of Wewahitchka Reserves the Right to Waive Informalities in Any Bid, to Accept and/or Reject Any or All Bids, and to Accept the Bid That, in Their Judgement, Will Be in the Best Interest to the City of Wewahitchka. Completion Date for This Project Will Be 240 Days (Substantial Completion) and 275 Days (Final Completion) From the Date of the Notice to Proceed Presented to the Successful Bidder. Liquidated Damages for Failure to Complete the Project on the Specified Date Will Be Set at $500.00 Per Day. The Proposed Construction Includes the Demolition of the Existing Interior Slab and Existing Wood Framing Members, Reconstruction of the Concrete Slab and Interior Wall Framing (Including a Fire Wall), Site Improvements Including Grading, Concrete Parking Areas, Access Connections, Sidewalks, Landscaping, and a Storm Water Management Facility. It is the Responsibility of the Contractor to Coordinate With the City and Construct All Utility Service Connections. Question Deadline 04/19/2024

Post-Bid

Fire / Police

$150,000.00

Public - City

Demolition, New Construction, Paving, Renovation, Site Work

27

12

2

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
86
Active Projects
30
Bidding Soon
511
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 26, 2024

May 27, 2024

Project location map

109 S 2nd St, Wewahitchka, FL

Related To This Project


Recently Viewed

Get Started

Unlock the Full Project List

Access every active project near you — get started today.

  • 825,000+ active commercial projects tracked daily
  • Verified contact info for the GC, owner, and architect
  • New leads delivered to your inbox every morning
Get Access

Create your account to get started.

Takes less than a minute — no credit card needed