BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a road / highway in Lake Saint Louis, Missouri. Completed plans call for site work for a road / highway; and for paving for a road / highway.

The proposed work includes:_Resurfacing and sidewalk reconstruction along Sommers Road, QT parking lot improvements, and two traffic signals. Scope also includes reconstruction and realignement of Old Highway N and road and sidewalk improvements on Hawk Ridge Trail Question Deadline 03/29/2024 Submit completed Contractor Questionnaire and/or Contractor Prequalification Questionnaire with attachments not later than seven (7) days prior to the date and hour of the bid opening. All questions concerning the bid document preparation can be directed to the Lake Saint Louis Department of Public Works at 636-695-4221. Project specific questions can be directed to the Lake Saint Louis Department of Public Works at 636-695-4221 or Mike Busch at Oates Associates, 314-588-8381, ext. 213. All labor used in the construction of this public improvement shall be paid a wage no less than the prevailing hourly rate of wages of work of a similar character in this locality as established by the Department of Labor and Industrial Relations (Federal Wage Rate), or state wage rate, whichever is higher.The City of Lake Saint Louis hereby notifies all bidders that it will affirmatively ensure that in any contract entered into pursuant to this advertisement, businesses owned and controlled by socially and economically disadvantaged individuals will be afforded full opportunity to submit bids in response to this invitation and will not be discriminated against on the grounds of race, color, religion, creed, sex, age, ancestry, or national origin in consideration for an award. A certified or cashier s check or a bid bond in the amount of 5% shall be submitted with each proposal. The DBE Goal for this project is 12%. No 2nd tier subcontracting will be allowed on this project. The City of Lake Saint Louis reserves the right to reject any or all bids.

Bid Results

Roads / Highways

$2,364,761.00

Public - City

Paving, Site Work

95

14

7

8

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
84
Active Projects
52
Bidding Soon
862
All Active Projects
338
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 17, 2024

img_map_placeholder

Sommers Rd & Old Hwy N, Lake Saint Louis, MO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.