Site work for a bridge / tunnel in Chincoteague, Virginia. Completed plans call for site work for a bridge / tunnel.

Replacement of sump pump pit room door and to replace the existing drain pipe and insulate and heat trace the counterweight pit drainage line. 2. The Contractor shall furnish and install all material, equipment, and labor for the installation of the insulation and heat tracing for the sump pump drainage piping. Insulation and heat tracing shall run from the sump pump pit to the concrete encased section at the wall. a. The existing drainage line from the existing check valves up to the penetration through the concrete wall shall be replaced. All new piping shall be PVC schedule 80 unless otherwise approved. b. The drain line along the floor shall be supported utilizing 316 stainless steel pipe supports anchored to the floor with 316 stainless steel anchors. c. The heat trace and insulation shall not extend into the sump pump pit. d. The heat trace control cabinet shall be located outside of the counterweight room near the existing pump controller. The location for installation shall be submitted to VDOT for review and approval. 1. The Contractor shall furnish and install a replacement door and frame assembly to replace the existing door to the sump pump room at elevation -13.75' within the control house. Any questions regarding this invitation for bid shall be addressed to Telicia Hailey at Telicia.Hailey@VDOT.virginia.gov. The issuing office shall determine whether any addendum should be issued as a result of any questions or other matters raised. Provide questions no later than 5:00 PM on March 7, 2024. All work on this project shall be complete within 180 days from Date of Award. The 180 day time period will commence when the formal award is made upon completion of VDOT Security Clearance activities. Bids will only be accepted from those bidders who are represented at this Pre bid conference. No one will be admitted after 10:05 AM EST. By my signature on this solicitation, I certify that this firm/individual and subcontractors is properly licensed for providing the goods/services specified. Furthermore, the contractor and subcontractors shall maintain the required license throughout the term of the contract. The contractor or their subcontractor shall immediately notify the contracting agency in writing in the event the license has been revoked. Provide the below information on Attachment F.

Award

Bridges / Tunnels

$400,000.00

Public - State/Provincial

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

6

Subscribe For Documents

8 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
52
Active Projects
24
Bidding Soon
440
All Active Projects
159
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 18, 2024

April 18, 2024

img_map_placeholder

Chincoteague Rd, Chincoteague, VA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.