EN

BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published May 16, 2024 at 8:00 PM

Updated May 17, 2024

Site work for a water / sewer project in Rock Falls, Illinois. Completed plans call for site work for a water / sewer project.

The proposed work for which the City of Rock Falls is soliciting bids includes the construction of approximately 4,645 feet of 4", 6", 8", 10", and 12" diameter water mains and approximately 2,978 feet of 1" diameter water services, complete with appurtenances and surface restoration work. A certified check or bank draft on a responsible solvent bank, or a satisfactory bid bond executed by the bidder on an acceptable surety company, payable to City of Rock Falls, in an amount not less than five percent (5%) of the total bid shall be submitted with each bid. The successful bidder will be required to furnish satisfactory performance and payment bonds each for 100% of the awarded contract price. No bid shall be withdrawn after the opening of bids without the consent of City of Rock Falls for a period of one hundred twenty (120) days after the scheduled time of receiving bids. Any contract or contracts awarded under this invitation for bids are expected to be funded in part by a loan from the Illinois Environmental Protection Agency (Illinois EPA). Attention is called to the fact that not less than the minimum salaries and wages as set forth in the construction documents must be paid on this project and that the contractor must ensure that employees and applicants for employment are not discriminated against because of race, color, religion, sex, or national origin. The City of Rock Falls is an equal opportunity employer. The City of Rock Falls does not discriminate on the basis of handicapped status in the admission or access to, or treatment or employment in, its programs or activities. The City of Rock Falls, Illinois reserves the right to reject any non-responsive bid and/or non-responsible bid. Bids may be held by the City of Rock Falls, Illinois for a period not to exceed one hundred twenty (120) days from the date of the opening of bids for the purpose of reviewing the bids and investigating the qualifications of bidders, prior to awarding the Contract. All work under this contract shall be substantially complete within 120 calendar days and final completion shall be within 180 calendar days from the execution of the Notice to Proceed ***Document Note: Copies of the Contract Documents, including Project Manual and the Construction Drawings, shall be obtained electronically in PDF format from the Willett, Hofmann & Associates, Inc. website at online Contractors shall click on "Bid Login" on the homepage of the website and follow the instructions.

Award

Water / Sewer

$1,721,481.00

Public - City

Site Work

43

10

3

8

Subscribe For Documents

24 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Substitution Procedures, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Construction Facilities, Field Offices and Sheds, Vehicular Access and Parking, Traffic Control, Project Identification, Execution and Closeout Requirements, Examination and Preparation, Execution, Application, Cleaning and Waste Management, Final Cleaning, Closeout Procedures, Closeout Submittals, Warranties, Project Record Documents, Spare Parts, Facility Operation, Facility Operation Procedures, Facility Maintenance Procedures
Division 03 - Concrete

Division 03 - Concrete

Cast-in-Place Concrete, Architectural Concrete, Concrete Finishing
Division 14 - Conveying Equipment

Division 14 - Conveying Equipment

Elevators
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

HVAC Air Distribution, HVAC Ducts and Casings
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Soils for Earthwork, Earth Moving, Grading, Excavation and Fill, Dewatering, Backfill, Special Foundations and Load-Bearing Elements, Driven Piles, Bored Piles
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Paving Specialties, Pavement Markings, Planting, Planting Preparation, Mulching, Turf and Grasses, Seeding
Division 40 - Process Interconnections

Division 40 - Process Interconnections

Process Integration, Common Work Results for Process Integration
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Material Processing and Handling Equipment, Piece Material Handling Equipment, Cranes and Hoists

Find More Local Projects

Within 75 Miles of This Project
75
Active Projects
44
Bidding Soon
861
All Active Projects
382
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 18, 2024

May 20, 2024

img_map_placeholder

Multiple Locations, Rock Falls, IL

Related To This Project


Find. Bid. Win. Your Next Project Starts Here.

Get the right
data with Project Intelligence

Share with your network.

Watermain Improvements Contract - Phase 3

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.