Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work for a civil project in Billings, Montana. Completed plans call for site work for a water / sewer project.
The project consists of raw water unloader/diversion facilities at and near the BBWA Canal on City property between Shiloh Road and 48th Street West south of Hesper Road. The BBWA unloader facilities will be designed by HDR Engineering to normally divert up to approximately 75 cfs (50 MGD) of raw water by gravity through a pipeline to a raw water pump station. The pump station (part of the water reservoir project already under a separate GC/CM contract) will normally pump water to a new storage reservoir or the water treatment plant (the water plant is also under contract). A second diversion structure to Canyon Creek will also be constructed that will be able to divert up to approximately 100 cfs to Canyon Creek which would convey the water back to the Yellowstone River. The contractor selected through this RFQ&P process will work with the current project team consisting of the City of Billings and HDR Engineering, Inc. to complete the project design and construction. SOQs and Proposals received will be ranked by a selection committee using a scoring system based on defined criteria. Preconstruction contract negotiations will ensue with the Contractor having the highest ranked SOQ and Proposal. Pending successful contract negotiations and Billings City Council approval, the Contractor will join the project team consisting of the City of Billings and HDR Engineering. During the preconstruction phase, the Contractor will work as an integral part of the project team to evaluate and further develop the project design, assisting the Engineer and City in identifying opportunities for improvement, value engineering, and offering alternative solutions. The various project components are currently in preliminary design. The Contractor will develop cost estimates and offer suggestions with respect to means, methods, materials innovations and construction sequencing. During the construction phase, the Contractor will provide the necessary resources and subcontractors to construct the project. Throughout the entire process, the objective is to maintain a spirit of cooperation and open communication so that project goals and objectives are clearly understood, potential problems are promptly resolved, and upon completion, the project is deemed a success by all. The Contractor or other key personnel cannot team with other partners to submit more than one SOQ and Proposal. Only one SOQ and Proposal per Contractor is acceptable, and City receipt of multiple SOQs and proposals from a Contractor will disqualify the Contractor. For any questions contact: Randy Straus, PE City of Billings Public Works Department Engineering Division 2224 Montana Avenue Billings, MT 59101 Phone: (406) 657-8301, Fax: (406) 237-6291 Email: strausr@billingsmt.gov The City of Billings reserves the right to reject any or all SOQs and Proposals if determined to be in the best interest of the City. The City of Billings is an Equal Opportunity Employer.
Post-Bid
Water / Sewer
$2,030,000.00
Public - City
Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 12, 2024
June 10, 2024
Multiple Locations, Billings, MT
Related To This Project
Billings, MT
Bid Date: Apr 09 2024
Billings, MT
Bid Date: Apr 09 2024
Billings, MT
Bid Date: Apr 12 2024
Billings, MT
Bid Date: May 02 2024
Billings, MT
Bid Date: May 02 2024
Billings, MT
Bid Date: Apr 09 2024
Billings, MT
Bid Date: May 09 2024
Billings, MT
Bid Date: Apr 16 2024
Billings, MT
Bid Date: Mar 21 2024
Billings, MT
Bid Date: Apr 12 2024
Billings, MT
Bid Date: May 07 2024
Billings, MT
Bid Date: Apr 05 2024
Billings, MT
Bid Date: Mar 19 2024
Billings, MT
Bid Date: Mar 14 2024
Billings, MT
Bid Date: Mar 05 2024
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.