BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published May 20, 2024 at 8:00 PM

Updated October 11, 2024

Renovation of a detention facility in Mount Charleston, Nevada. Completed plans call for the renovation of a 6,066-square-foot detention facility.

As of May 20,2024, this project has not yet been awarded. A timeline for award has not yet been established. The "Project" of which the "Work" of the Contract is a part titled Spring Mountain Youth Camp Building 4 and Building 5 Alteration and is located at 2400 Angel Peak Place, Mount Charleston, Nevada 89124. The "Work" is described in the Project Drawings and Divisions 01 through 48 of the Project Manual. The Work consists of the abatement of all hazardous material and the installation of all new construction finishes in Building No. 4 and Building No. 5, which is approximately 6,066 square feet combined, single story buildings currently unoccupied with an interior ceiling height of 10 feet. Construction includes all administrative work as outlined in the Division 01 General Requirements and the following using materials noted on Drawings and Specifications: Installation of all interior finishes and exterior finishes in addition to metal furring, waterproofing, building envelope insulation, attic space insulation, new doors, door frames and windows, flooring, and ceiling alterations. The work includes new accessible plumbing fixtures and above ground plumbing pipe replacement, cleaning and painting the exterior of the existing heating/ventilation/air-conditioning (HVAC) ductwork and diffusers, and electrical wiring, cabling and conduit for data and communications. Provide all labor, materials, and equipment necessary to complete the scope of work shown on the construction documents and in the construction specifications for Building 4 & 5 alterations, including the abatement of hazardous materials; rough carpentry; thermal insulation; elastomeric roof and wall coating, and sheet metal flashing and trim; doors and frames; fiberglass windows; door hardware; gypsum board; tile; carpet; interior painting; toilet compartments; corner guards; washroom accessories; plumbing sleeves; pipe escutcheons; ball valves; plumbing pipe and equipment hangers and supports; pipe and equipment identification; pipe insulation; domestic water piping and specialties; sanitary waste and vent piping; sanitary waste piping specialties; electric domestic water heaters; water closets, urinals, lavatories and sinks; interior communication pathways; horizontal cabling and testing identification. Question Cuttoff Date & Time 3/26/2024 08:00:00 PM (ET)

Bid Results

Jails / Prisons

$2,284,861.00

Public - County

Renovation

82

26

4

3

Subscribe For Documents

19 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
61
Active Projects
30
Bidding Soon
378
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 8, 2024

June 7, 2024

Project location map

2400 Angel Peak Pl, Mount Charleston, NV

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.