Published April 22, 2024 at 8:00 PM

Updated October 1, 2024

Site work for a civil project in Broken Bow, Oklahoma. Completed plans call for site work for a water / sewer project.

Installation of 1670' of 14" HDPE and 12" C900 Watermain by open cut and/or bore. Approximately 1,800LF of 14" HDPE and 12" C900 PVC Watermain including River Bore w/ encasement. It is the responsibility of the Contractor bidding the project to ensure the accuracy of the reproduction of all Bid Documents and Construction Drawings. This includes, but is not limited to, proper scaling, paper width and length, etc. Failure to do so may result in errors in the Unit Bid Quantities and or Bids Amounts. No verbal questions will be responded to. Please submit through online website. Only responses issued via written Addenda or answered in Q&A section of online website are binding. Complete sets of Bidding Documents must be used in preparing bids. Neither Owner nor Engineer assumes any responsibility for errors or misinterpretations resulting from the use of incomplete or incorrectly printed / scaled sets of bidding documents. Question Deadline 03/28/2024

Award

Water / Sewer

$625,000.00

Public - City

Site Work

8

21

4

Subscribe For Documents

32 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet
Division 01 - General Requirements

Division 01 - General Requirements

Price and Payment Procedures, Allowances, Cash Allowances, Contract Modification Procedures, Payment Procedures, Schedule of Values, Administrative Requirements, Submittal Procedures, Certificates, Quality Requirements, Regulatory Requirements, Temporary Facilities and Controls, Vehicular Access and Parking, Traffic Control, Execution and Closeout Requirements, Execution, Application, Cleaning and Waste Management, Progress Cleaning, Site Maintenance, Final Cleaning, Closeout Submittals, Bonds
Division 03 - Concrete

Division 03 - Concrete

Concrete Reinforcing, Reinforcing Steel, Cast-in-Place Concrete, Mass Concrete
Division 04 - Masonry

Division 04 - Masonry

Stone Assemblies
Division 09 - Finishes

Division 09 - Finishes

Painting and Coating, Painting
Division 10 - Specialties

Division 10 - Specialties

Information Specialties, Signage
Division 13 - Special Construction

Division 13 - Special Construction

Integrated Construction
Division 21 - Fire Suppression

Division 21 - Fire Suppression

Water-Based Fire-Suppression Systems, Facility Fire-Suppression Water-Service Piping
Division 22 - Plumbing

Division 22 - Plumbing

Plumbing, Common Work Results for Plumbing, General-Duty Valves for Plumbing Piping
Division 23 - Heating Ventilating and Air Conditioning

Division 23 - Heating Ventilating and Air Conditioning

Heating, Ventilating, and Air Conditioning (HVAC), Common Work Results for HVAC, General-Duty Valves for HVAC Piping, Instrumentation and Control for HVAC
Division 26 - Electrical

Division 26 - Electrical

Facility Electrical Power Generating and Storing Equipment
Division 27 - Communications

Division 27 - Communications

Voice Communications
Division 28 - Electronic Safety and Security

Division 28 - Electronic Safety and Security

Electronic Safety and Security
Division 31 - Earthwork

Division 31 - Earthwork

Earthwork, Common Work Results for Earthwork, Aggregates for Earthwork, Earth Moving, Grading, Excavation and Fill, Excavation, Trenching, Dewatering, Fill, Backfill, Erosion and Sedimentation Controls, Special Foundations and Load-Bearing Elements, Foundation Anchors
Division 32 - Exterior Improvements

Division 32 - Exterior Improvements

Bases, Ballasts, and Paving, Rigid Paving, Concrete Paving, Curbs and Gutters, Planting, Plants, Trees
Division 33 - Utilities

Division 33 - Utilities

Utilities, Common Work Results for Utilities, Water Utilities
Division 34 - Transportation

Division 34 - Transportation

Transportation
Division 41 - Material Processing and Handling Equipment

Division 41 - Material Processing and Handling Equipment

Manufacturing Equipment, Machining Equipment, Boring Equipment

Find More Local Projects

Within 75 Miles of This Project
9
Active Projects
2
Bidding Soon
146
All Active Projects
63
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 4, 2024

May 6, 2024

img_map_placeholder

N US Hwy 259, Broken Bow, OK

Related To This Project


Unlock Efficiency: The Future of Commercial Construction is Data-Driven

Access Now

Get the right
data with Project Intelligence

Share with your network.

Broken Bow Little River Bore

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.