Renovation of a pre-engineered storage facility in Hastings, Nebraska. Completed plans call for the renovation of a pre-engineered storage facility.

AUXILIARY BOILER PRE-ENGINEERED METAL BUILDING FOR WHELAN ENERGY CENTER, UNIT 2 PUBLIC POWER GENERATION AGENCY HASTINGS, NEBRASKA Formal Contract No. PPGA 2024-03 Auxiliary Boiler Pre-Engineered Metal Building at Whelan Energy Center, Unit 2, Public Power Generation Agency, Hastings, Nebraska Proposals received after the above time and date will be returned unopened to the party submitting the proposal. Each proposal shall be accompanied by a cashier's check, certified check on a solvent U.S. commercial bank, or a bid bond in an amount of not less than five percent (5%) of the total bid. Such check or bid bond shall be contained in a separate envelope attached to bidder's proposal. All proposal and bid bonds shall have original signatures. The successful bidder will be required to furnish a Performance Bond in the sum of the full amount of the Contract within ten (10) days of the date of award. No additional time will be allowed the Contractor for providing the Performance Bond. Proposals will be considered only from those bidders who are qualified by previous experience in performing work of this type, scope and complexity specified. Bidders without previous successful work history with PPGA will be required to pre-qualify by submitting information concerning their organization, experience, and financial status as requested in the bidding instructions. The PPGA reserves the right to accept the bid which best suits its needs whether the price is the lowest or not, to reject any or all bids, and to waive any informalities. No proposal may be altered, withdrawn or resubmitted within 60 days after the date set for the opening of proposals. Design and furnish a complete 60' x 50' Packaged Metal Building complete with all plumbing, electrical, lighting, doors, insulation, and other appurtenances per the technical specifications in Section 4. Please contact Brandon Miller, Mechanical Engineer, at 402-462-3653 if you have any questions about this project or would like to set up a site visit. Installation of the PEMB will follow the installation of the Auxiliary Boiler onto the foundation. PEMB will be installed with Auxiliary Boiler in place. The work done under this contract to be coordinated with PPGA and other Contractors. Dates listed are approximate and subject to change. The bidder shall provide a schedule for construction, including the lead time for manufacturing the building. The Contractor shall provide labeling of hazardous materials and training of employees in the safe usage of such materials as required under any applicable federal, state, or local law, regulation, statute, or ordinance. For technical questions regarding the model structure and scope, the point of contact shall be the vendor's appointed technician or delegate.

Award

Warehouse / Distribution - Pre-Engineered Storage Building

$457,657.00

Public - City

Renovation

14

11

3

Subscribe For Documents

5 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
31
Active Projects
18
Bidding Soon
223
All Active Projects
112
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 10, 2024

May 10, 2024

April 30, 2025

img_map_placeholder

4520 E South St, Hastings, NE

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.