BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Tyngsborough, Massachusetts. Completed plans call for the renovation of a educational facility.

Project is out to Rebid Modernization of an elevator replacing the car, adding a stop, and associated components needed to achieve this. The existing elevator has been provided by the Otis Elevator Company. Maintaining the existing capacity and speed ofthe elevator. o Add an intermediate elevator landing that opens to the rear ofthe existing elevator. Masonry modifications to the existing shaft shall be by others, installation of elevator door, frame, call button, and associated elevator hardware will be by the elevator contractor. o Provide new, automatic self-leveling. o Provide new microprocessor-based controller and all associated hardware. o Provide new solid-state starter. Match existing power requirements and configuration. o Retain existing pump motor and valves, inspect, and adjust as required for proper operation. o Existing hoistway entrance, track, hangers, and hoistway doors will be replaced with new, provide new rear entrance and doors at intermediate landing. Provide new door protection devices and interlocks. o Retain existing hoistway operating devices and provide new car guides. o Provide new #4 brushed stainless steel elevator car interior with VCT flooring, and new operating panel with LED illuminated landing buttons, emergency call, and door open and close buttons. o Provide emergency car lighting, in-car direction lanterns, and audible announcements. o Provide new hall buttons and hall lanterns at each landing. o The contractor must confirm that sufficient electrical power is provided for all new and existing elevator systems and provide additional circuits as necessary. o Provide a 1-year warranty for materials and labor from the date of substantial completion and provide terms for an optional 3-year maintenance contract effective after the warranty period. o The elevator contractor will provide a fully operational 3 landing elevator and associated systems that complies with all applicable codes and regulations. Delivery and installation to take place during the time frame of June 17, 2024-August 26, 2024.

Award

Educational

$274,686.00

Public - City

Renovation

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

5

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
370
Active Projects
230
Bidding Soon
2,965
All Active Projects
1,318
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 24, 2024

June 17, 2024

img_map_placeholder

250 Pawtucket Blvd, Tyngsborough, MA

Related To This Project


Get the most reliable construction project data instantly.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.