Published October 1, 2024 at 8:00 PM

Updated October 2, 2024

Site work and paving for a mixed-use development in Furnace Creek, California. Completed plans call for site work for a bridge / tunnel; road / highway; for paving for a road / highway; sidewalk / parking lot; and sidewalk / parking lot.

PROJECT NUMBER: CA ERFO NP DEVA 2023 - 3(2) PROJECT NAME: REPAIRS AND ARMORING PROJECT DESCRIPTION: The project is located in Death Valley National Park in Inyo County. Death Valley National Park sustained significant roadway damage park wide due to historic rainfall from Hurricane Hillary. The base schedule consists of pavement patching and armoring on multiple routes, removing and replacing asphalt on harmony borax trail, and roadway reconditioning and placing new culverts on West Side Road. Option X consists of pavement patching and armoring on Emigrant Canyon Road from MP 0.0 to MP 8.0. SCOPE OF THE WORK: This project consists of pavement patching, roadway reconditioning, armoring, sign installation and replacement, and installing new gates on multiple routes throughout the park. Armoring consists of paved shoulders, gabion walls, revet mattresses and a combination of revet mattresses with concrete barrier. The desert tortoise is present along some routes at elevations higher than 2,000 feet. Biological and Archeological monitors will be required for the duration of the project. The contractor will be allowed to set up stand tanks at three locations within the park to collect water. There are limitations to the quantity of water that can be pulled from each source per day. SIGNIFICANT QUANTITIES: Significant items include (quantities are subject to change): Schedule A Removal of Pavement, Asphalt - 2,200 SQYD Revet Mattress, Galvanized or Aluminized Coated - 2,500 SQYD Roadway Reconditioning - 3 Mile Asphalt Concrete Pavement Patch, Type 1 - 7,700 SQYD 24-Inch Pipe Culvert - 100 LNFT Sidewalk, Asphalt - 2,100 LNFT Concrete Barrier - 2,800 LNFT Option X Gabions, Galvanized or Aluminized Coated - 3,500 CUYD Revet Mattress, Galvanized or Aluminized Coated - 650 SQYD Contractor Furnished Gabion Wall Design - LPSM Asphalt Concrete Pavement Patch, Type 1 - 4,500 SQYD Concrete Barrier - 550 LNFT ANTICIPATED SCHEDULE: Advertise: July 2024; Award: August 2024; Construction: August 2024 through February 2025. The estimated bid range is between $10,000,000 and $20,000,000. *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document.

Award

Roads / Highways

$16,816,868.00

Public - Federal

Paving, Site Work

1

19

20

7

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
5
Active Projects
1
Bidding Soon
31
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

August 13, 2024

September 19, 2024

Project location map

Multiple Locations, Furnace Creek, CA

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.