Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Renovation of a municipal facility in Edmond, Oklahoma. Completed plans call for the renovation of a municipal facility.
Cost Estimate: $138,000.00 Contact Person(s) for Questions: Doug Perkins - 405-715-9540 - Doug.Perkins@osbi.ok.gov Jerry Tate - 405-879-2633 - Jerry.Tate@osbi.ok.gov Leonardo Rodriguez - Leonardo.Rodriguez@omes.ok.gov If the bid exceeds $100,000, a cashier's check, a certified check or surety bid bond in the amount of five percent (5%) of the total bid is required. The certified or cashier's check must be delivered to the Owner's (Construction and Properties) Offices prior to the Bid Opening; other bid securities may be uploaded during the completion of online electronic bidding. Security checks will be returned to all but the three lowest bidders after the bid opening. The three lowest bid securities will be retained until the contract is awarded. 1.1 Contract resulting from this solicitation shall be for the purchase, removal, and installation of a laboratory grade open scroll air compressor system located on the 4th floor: 1.1.1 Properly disconnect and remove from site, the end-of-life triplex piston-driven oil-less air compressor system (including air receiver tank, air dryers, air purifiers, control panel, dew point monitor, carbon-monoxide detector, and skid package) on the fourth floor. This facility possesses a freight-sized elevator with a 5,000-pound capacity. 1.1.2 Replace the triplex piston-driven oil-less air compressor system with an open quadplex, highpressure, oil-less, 10HP, scroll-type air compressor system rated for a maximum of 145 PSIG. The delivered/installed scroll compressor system shall feature four (4) 10HP, oil-less scroll air compressors and all required associated equipment. Each compressor shall be belt-driven oil-less rotary scroll single stage of air-cooled construction. The rotary design shall not require any inlet or exhaust valves and shall be rated for 100% continuous duty. Tip seals shall be of a composite polytetrafluoroethylene (PTFE) material and be rated for 8,000 hours operation for 10HP pumps. Compressor bearings shall be external to the air compression chamber and shall all be serviceable for extended compressor life. Bearing maintenance shall not be required until 5,000 run hours. Compressors shall have an integral radial flow fan for cooling and shall not require any additional electric cooling fans. Each compressor shall have flexible connectors on intake and discharge, an electric drive motor, a discharge check valve, a fan-cooled aftercooler, a condensate separator, and a high discharge temperature shut down sensor/switch. Each compressor module shall have an isolation valve and a moisture separator with automatic drain plumbed to a local floor drain. The only field connections required shall be system air intake, air supply, and power connection (460VAC) at the control panel. All interconnecting piping, wiring, and vibration isolation pads shall be included with the system.
Award
Municipal
$157,400.00
Public - State/Provincial
Renovation
Documents for this project are exclusively Specifications. If Plans become available, we will add them here.
3
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
April 9, 2024
May 9, 2024
800 E 2nd St, Edmond, OK
Related To This Project
Edmond, OK
Bid Date: Apr 04 2024
Edmond, OK
--
Edmond, OK
Bid Date: Apr 24 2024
Edmond, OK
Bid Date: Apr 23 2024
Edmond, OK
Bid Date: May 07 2024
Edmond, OK
Bid Date: May 01 2024
Edmond, OK
Bid Date: May 02 2024
Edmond, OK
Bid Date: May 14 2024
Edmond, OK
Bid Date: Mar 14 2024
Edmond, OK
Bid Date: Mar 26 2024
Edmond, OK
Bid Date: Feb 26 2019
Edmond, OK
Bid Date: Mar 02 2021
Edmond, OK
Bid Date: Feb 14 2019
Edmond, OK
Bid Date: Nov 10 2020
Edmond, OK
Bid Date: Jun 27 2019
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Get the most reliable construction project data instantly.
Sign up now to get instant access to project search, five projects and five companies, free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.