BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published November 7, 2025 at 7:00 PM

Updated November 8, 2025

Demolition, site work and paving for a bridge / tunnel in Penhold, Alberta. Design plans call for the demolition of a bridge / tunnel; for site work for a bridge / tunnel; and for paving for a bridge / tunnel.

BF01423 Bridge Replacement Carrying HWY 50 Over Parlby Creek (Construction WAC0003200). BF70184 Culvert Replacement Carrying HWY 42 Over Three Hills Creek Construction (WAC0003180). BF74508 Bridge Replacement Carrying HWY 56 Over Big Valley Creek Construction (WAC0010734). TIMELINE: Project are currently not included in the owner's three-year construction program. Tender and construction timelines to be determined. Further update in 2026. *Budget is unreleased.

Design

Bridges / Tunnels

$7,500,000.00

Public - State/Provincial

Demolition, Paving, Site Work

3

7

3

Subscribe For Documents

3 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
68
Active Projects
20
Bidding Soon
566
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 1, 2028

Project location map

Multiple Locations, Penhold, AB

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.