Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Published April 17, 2026 at 8:00 PM
Updated May 21, 2026
Renovation of a municipal facility in Largo, Florida. Conceptual plans call for the renovation of a municipal facility.
The Public Works Department would like to assist with planned HVAC system replacements. With industry standards giving approximately 10 years of useful life expectancy on the City's HVAC equipment, this process will help in planning for replacing systems when repairing becomes more costly and less efficient. The project outlines a five-year prioritization of HVAC system replacements. The following are planned HVAC replacements included in this project. The Historic Feed Store building containing a 10-ton air handler with two 5-ton condensers system replacement will be replaced. The Environmental Services Administration HVAC system containing two 20-ton condensing units and two 20-ton air handler units will be replaced. Also expected to be replaced is the CPPAC 120-ton chiller unit. This unit has reached the end of its useful life. The unit is covered in rust. This unit is prioritized because it is a storm shelter. This unit should be replaced before catastrophic failure occurs. The Highland Complex needs two 130-ton Chiller units replaced. This unit exceeds its useful life expectancy and has multiple rust spots on the compressors that have to be sanded down and painted in an attempt to prevent the spread. The building is also in need of 5 air handler unit replacements. Best practice is to change out both systems when it is needed, to maintain the efficiency of the system. The Highland Family Aquatics Center HVAC system will need to be replaced. This unit has one air handler unit (AHU) and two CPAC units. The Emergency Operations Center HVAC system needs to be replaced. This includes a 10-ton Outside air system, 20 split system Air Handler, and two Condensers. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of April 17,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.
Conceptual
Municipal
$1,642,100.00
Public - City
Renovation
Plans and Specifications are not available for this project. If that changes, they will be made available here.
Trades Specified
Division 00 - Lorem Ipsum
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
Find More Local Projects
Within 75 Miles of This Project
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
June 1, 2027
Multiple Locations, Largo, FL
Related To This Project
Largo, FL
Bid Date: Apr 16 2026
Largo, FL
Bid Date: Apr 27 2026
Largo, FL
Bid Date: May 28 2026
Largo, FL
Bid Date: Apr 17 2026
Preview Active Commercial Construction Projects Like This One
Get preview access now—no credit card required.
