BLOCK PAGE!!!

Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Published April 17, 2026 at 8:00 PM

Updated May 21, 2026

Renovation of a municipal facility in Largo, Florida. Conceptual plans call for the renovation of a municipal facility.

The Public Works Department would like to assist with planned HVAC system replacements. With industry standards giving approximately 10 years of useful life expectancy on the City's HVAC equipment, this process will help in planning for replacing systems when repairing becomes more costly and less efficient. The project outlines a five-year prioritization of HVAC system replacements. The following are planned HVAC replacements included in this project. The Historic Feed Store building containing a 10-ton air handler with two 5-ton condensers system replacement will be replaced. The Environmental Services Administration HVAC system containing two 20-ton condensing units and two 20-ton air handler units will be replaced. Also expected to be replaced is the CPPAC 120-ton chiller unit. This unit has reached the end of its useful life. The unit is covered in rust. This unit is prioritized because it is a storm shelter. This unit should be replaced before catastrophic failure occurs. The Highland Complex needs two 130-ton Chiller units replaced. This unit exceeds its useful life expectancy and has multiple rust spots on the compressors that have to be sanded down and painted in an attempt to prevent the spread. The building is also in need of 5 air handler unit replacements. Best practice is to change out both systems when it is needed, to maintain the efficiency of the system. The Highland Family Aquatics Center HVAC system will need to be replaced. This unit has one air handler unit (AHU) and two CPAC units. The Emergency Operations Center HVAC system needs to be replaced. This includes a 10-ton Outside air system, 20 split system Air Handler, and two Condensers. The project is included in the City's 2026-2030 Capital Improvement Program (CIP). As of April 17,2026, further details have not yet been identified. *Project information has been obtained through a public capital improvement plan (CIP). A CIP is a financial schedule for short- and long-range projects which is updated regularly. Information listed in the CIP often evolves based on funding availability and the project details, including timeline and value, are subject to change. The content management team will continue to pursue additional details as they become available.

Conceptual

Municipal

$1,642,100.00

Public - City

Renovation

Plans and Specifications are not available for this project. If that changes, they will be made available here.

Subscribe For Documents

1 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
0
Active Projects
0
Bidding Soon
0
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

June 1, 2027

Project location map

Multiple Locations, Largo, FL

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.