BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work and paving for a sidewalk / parking lot in Milton, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.

The Work comprises the installation of twenty-two (22) ADA ramps, additional curbing and sidewalks, relocation of curbing and sidewalks and all appurtenances for a complete job in accordance with the Contract Documents. ADA ramps will be designed by the Contractor and supplied to the engineer for review and approval. Each Bid shall be accompanied by a certified check, cashier's check, negotiable U.S. Government Bonds (at par value) or approved Bid Bond in the amount of 10 percent of the total Bid Price, payable to Milton Borough, as a guarantee that the Bidder, if its Bid is accepted, will promptly obtain the required Bonds and Insurance, prepare the required submittal documents and execute the Agreement. All Bids shall remain irrevocable for a period of 60 calendar days from the date of Bid opening, or as allowed by law. Davis Bacon Wage Rates apply to this project. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the Contractor must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. Milton Borough is utilizing federal funds for this project, and has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138 and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 75 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the Contractor shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. For projects which the amount of HUD or CDBG funding exceeds $200,000 the CONTRACTOR must attempt to meet the minimum numerical goals of which 25% or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers, per 24 CFR Part 75.19; and 5% or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers, as defined in 24 CFR Part 75.21. The SEDA Council of Governments, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. Davis-Bacon and Related Acts apply to this Project. Bids may be held by Milton Borough for up to 60 days from the date of opening for the purpose of reviewing the Bids and investigating the qualifications of Bidders prior to awarding the contract. Milton Borough reserves the right to accept the bid for one or both addressable structures, to reject any or all Bids, to waive any irregularities, or to negotiate the Contract amounts. ***Document Note: A full set of the Contract Documents can be viewed at the Milton Borough Municipal Office between the hours of 8:00 A.M and 4:00 P.M. Questions Due Date: Mar 21st 2024, 11:00 AM EDT

Award

Sidewalks / Parking Lot

$105,500.00

Public - City

Paving, Site Work

18

10

4

Subscribe For Documents

28 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
110
Active Projects
67
Bidding Soon
777
All Active Projects
368
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 26, 2024

April 25, 2024

img_map_placeholder

S Turbot Ave, Milton, PA

Stop wasting time. Get and stay ahead of your competition.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.