Privately Funded
Bidding Soon
Documents Available
Publicly Funded
Addenda Available
Post-Bid
Saving Project...
Site work and paving for a sidewalk / parking lot in Milton, Pennsylvania. Completed plans call for site work for a sidewalk / parking lot; and for paving for a sidewalk / parking lot.
The Work comprises the installation of twenty-two (22) ADA ramps, additional curbing and sidewalks, relocation of curbing and sidewalks and all appurtenances for a complete job in accordance with the Contract Documents. ADA ramps will be designed by the Contractor and supplied to the engineer for review and approval. Each Bid shall be accompanied by a certified check, cashier's check, negotiable U.S. Government Bonds (at par value) or approved Bid Bond in the amount of 10 percent of the total Bid Price, payable to Milton Borough, as a guarantee that the Bidder, if its Bid is accepted, will promptly obtain the required Bonds and Insurance, prepare the required submittal documents and execute the Agreement. All Bids shall remain irrevocable for a period of 60 calendar days from the date of Bid opening, or as allowed by law. Davis Bacon Wage Rates apply to this project. The Bidder shall include the fully completed Non-Collusion Affidavit with the bid. In addition to the Equal Employment requirements of Executive Order 11246 regarding discrimination, the Contractor must establish a 6.9% goal for female participation and a 1% goal for minority participation in his/her aggregate on-site construction workforce for contracts in excess of $10,000. Milton Borough is utilizing federal funds for this project, and has adopted a Minority and Women Business Enterprise (MBE/WBE) plan in accordance with Executive Orders 11625, 12138 and 12432 and a Section 3 Action Plan in accordance with Title 24 Part 75 Code of Federal Regulations. As such, the bidders/offerors must submit documentary evidence of minority and women business enterprises and Section 3 business concerns who have been contacted and to whom commitments have been made. Documentation of such solicitations and commitments shall be submitted with the bid. Moreover, the Contractor shall strive to meet the MBE goal of 5% and the WBE goal of 3% for contracts of $25,000 or more. For projects which the amount of HUD or CDBG funding exceeds $200,000 the CONTRACTOR must attempt to meet the minimum numerical goals of which 25% or more of the total number of labor hours worked by all workers on a Section 3 project are Section 3 workers, per 24 CFR Part 75.19; and 5% or more of the total number of labor hours worked by all workers on a Section 3 project are Targeted Section 3 workers, as defined in 24 CFR Part 75.21. The SEDA Council of Governments, in accordance with its Section 3 Action Plan, may provide a bid preference to a bidder who is a Section 3 business concern. MBE/WBE and Section 3 business concerns shall be afforded full opportunity to bid without discrimination. Davis-Bacon and Related Acts apply to this Project. Bids may be held by Milton Borough for up to 60 days from the date of opening for the purpose of reviewing the Bids and investigating the qualifications of Bidders prior to awarding the contract. Milton Borough reserves the right to accept the bid for one or both addressable structures, to reject any or all Bids, to waive any irregularities, or to negotiate the Contract amounts. ***Document Note: A full set of the Contract Documents can be viewed at the Milton Borough Municipal Office between the hours of 8:00 A.M and 4:00 P.M. Questions Due Date: Mar 21st 2024, 11:00 AM EDT
Award
Sidewalks / Parking Lot
$105,500.00
Public - City
Paving, Site Work
Trades Specified
Division 00 - Lorem Ipsum
Find More Local Projects
Within 75 Miles of This Project
One Low Price
- One license and one market
- Details and key contacts on all bidding projects
- Organize your pipeline with a digital bid board
- Automatically match opportunities to your profile
- Saved searches deliver daily project leads to your email inbox
Market Pricing Around
- All Starter Product functionality
- Access to all documents (plans, specifications, and addenda)
- Access to planning projects
- Access to contact information
- Ability to Export
You’ve Reached the Free View Limit
Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.
Come back in [[refresh_days]] to get [[project_count]] more free projects.
March 26, 2024
April 25, 2024
S Turbot Ave, Milton, PA
Related To This Project
Milton, PA
Bid Date: May 09 2024
Milton, PA
Bid Date: Apr 29 2024
Milton, PA
Bid Date: Jul 01 2024
Milton, PA
Bid Date: Jul 10 2024
Milton, PA
Bid Date: Aug 15 2024
Milton, PA
Bid Date: Oct 15 2024
Milton, PA
Bid Date: Nov 13 2024
Milton, PA
Bid Date: Nov 26 2024
Milton, PA
Bid Date: Feb 23 2024
Milton, PA
Bid Date: Nov 13 2023
Milton, PA
Bid Date: Nov 13 2023
Milton, PA
Bid Date: Nov 14 2023
Milton, PA
Bid Date: Oct 23 2023
Milton, PA
Bid Date: Oct 17 2023
Milton, PA
Bid Date: Feb 04 2022
Recently Viewed
--
--
--
--
--
--
--
--
--
--
Stop wasting time. Get and stay ahead of your competition.
Get instant access to the most complete and actionable commercial construction data available. Try it for free.
Get the right
data with Project Intelligence
Project Shared
with
example@example.com
Choose what you would like to do.
Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.
What is your business type?
We have a wide variety of products that are purpose built for certain business types.