BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a mixed-use development in Salt Lake City, Utah. Completed plans call for site work for a playground / park / athletic field.

Granite School District (GSD) is requesting the services of a General Contractor (B100) or General Engineering Contractor (E100) for new soccer and lacrosse field athletic netting at Skyline High School, Design and Installation of outdoor sports netting for the north and south ends of the soccer and lacrosse fields. Removal of all spoils from construction activities. Restoration of damage to turf, irrigation, and/or the Facility resulting from construction activities. Refer to Scope of Work section in this document for additional requirements. The bidder is required to submit a Bid Bond, with the bid, for a total bid amount that is $50,000.00 or greater. Refer to instructions contained in the solicitation documents on the Utah Public Procurement Place (U3P). Failure to submit a Bid Bond will cause the bid to be considered non-responsive.. Questions must be submitted by Monday, March 25, 2024, at 5:00 PM MDT. All questions must be submitted via the Utah Public Procurement Place (U3P). Questions submitted directly to Owner or Architect will not be answered until re-submitted through U3P. Contractor is responsible for reviewing the responses to any questions posted to U3P and acknowledges that all responses become an integral part of the bid package and project requirements. Successful Bidder shall furnish all labor, material, and equipment to design and perform the work to install the athletic netting to the Specifications and in accordance with Bid Documents, General and Supplemental Conditions of the Construction Contract, and other documents as provided for the performance of this Work. Bidder shall provide turnkey solution for design, fabrication, and installation of a mesh outdoor sports netting system, with associated supporting structures, to be erected at the north and south ends of the two soccer/lacrosse fields as shown on the Drawings. Sports netting assembly shall be 120 feet in length, 30 feet in height and centered on the field centerline at each end of the fields. Sports netting shall be 1" or 1 1/2" nylon or polypropylene mesh.

Award

Playgrounds / Parks / Athletic Fields

$179,200.00

Public - County

Site Work

3

7

3

Subscribe For Documents

9 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
62
Active Projects
28
Bidding Soon
551
All Active Projects
257
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

June 3, 2024

img_map_placeholder

3251 E 3760 S, Salt Lake City, UT

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.