BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of an educational facility in Waterloo, Ontario. Completed plans call for the renovation of a educational facility.

Reference Number 0000266500 Question Acceptance Deadline 2024/04/02 05:00:00 PM EDT Pricing Lump sum This project aims to transition the existing constant air volume ventilation system within the animal research facility into a demand control ventilation system by incorporating an air quality monitoring system that complies with CCAC guidelines. Currently, the animal research facility operates with a constant air volume ventilation system, maintaining approximately 15-20 air changes per hour or higher in each zones/rooms. To improve energy conservation, the University of Waterloo aims to transition this system into a demand control ventilation system by incorporating an air quality monitoring system that complies with CCAC guidelines. The existing HVAC system features modulating air control valves on the supply and exhaust ducts serving each zone/room. Additionally, the central air handling unit (AHU SF-13) dedicated to serving the animal research facility is equipped with variable speed drives on its two (2) supply fans. The exhaust system is served by two (2) strobic exhaust fans (EF-23 & 24) located on the roof of the building. These exhaust fan are also equipped with variable speed drives. The overarching goal is to maximize the utilization of existing infrastructure and equipment for the implementation of the new demand control system. In general, the scope of work includes the supply, programming, and installation of an air quality monitoring system in the Animal Research Facility. Including the integration of the new air quality monitoring system into the existing building automation system (BAS). The scope extends to the startup and commissioning of all necessary control components, ultimately resulting in the provision of a fully operational turn-key demand control system compliant with the latest CCAC guidelines. Official bid documents must be obtained from www.merx.com and bid submissions must be done through the Merx platform.

Post-Bid

Educational

$300,000.00

Public - State/Provincial

Renovation

25

13

3

2

Subscribe For Documents

7 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
165
Active Projects
11
Bidding Soon
1,979
All Active Projects
751
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 10, 2024

May 13, 2024

img_map_placeholder

200 University Ave W, Waterloo, ON


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.