BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a playground / park / athletic field in Evergreen Park, Illinois. Completed plans call for site work for a playground / park / athletic field.

Veterans Park Concrete Construction of retaining walls of various heights and flatwork per drawing. Concrete mix to be IDOT 4.6 State Mix. All walls to begin 12" below grade with (2)#5 continuous rebar, #5 rebar 2' on center upright for walls exceeding 48" Walls around perimeter to have and 18" exposed finished top and face. All flatwork to be poured to a depth of 5" and have a broom finish. Excavation and base prep (including stone) will be completed by the village, and should be excluded from proposal. Inquiries and site visit requests may be directed to Assistant Director of Public Works- Gavin Yeaman, (708) 229-3350 or gyeaman@evpkadm.org Proposals will not be accepted without a prior site visit. Please take note that all of the insurance noted below is required. For example, the Village of Evergreen Park must be named as additional insured on a "primary, Non--contributory basis" for Part 1 noted below. Also, a separate OCP policy naming the Village of Evergreen Park as the "Insured" and must also be obtained as outlined under Part 2 below, and all insurance noted under Parts 3, 4 and 5 below must be provided, unless specifically deleted for this project. Minimum Limits of Insurance Contractor and his Subcontractors shall maintain limits of no less than: Contractors - Commercial General Liability: $1,000,000 combined single limit per occurrence for bodily inquiry, personal injury and property damage. The general aggregate shall be twice the required occurrence limit. Minimum General Aggregate shall be no less than $2,000,000. The General Liability Policy shall include coverage for Contractual Liability and Broad Form Property Damage Coverage. The Village of Evergreen Park shall be named as Additional Insured on a Primary Non--Contributory basis. The Policy will include a Per Project Aggregate Endorsement. Also, any "XCU_Exclusions" shall be deleted. Z Village of Evergreen Park - Contractors Protective Liability : OCP limits shall be $1,000,000 combined single limit per occurrence for bodily injury and property damage. The general aggregate shall be twice the required occurrence limit. Minimum General Aggregate shall be no less than $2,000,000. The General Liability Policy shall include coverage for Contractual Liability. There will be NO deductible or self-insured retention amount due on this OCP policy. The coverage afforded by this OCP policy shall be primary and at no time shall any endorsements, additional forms, or riders be attached that would modify or limit said coverage. X Automobile Liability: $1,000,000 combined single limit per accident for bodily injury and property damage for any vehicle owned, leased, hired, or non-owned, used by the Contractor. 1 Workers' Compensation and Employers' Liability: Workers' Compensation limits as required by the Labor Code of the State of Illinois and Employers' Liability limits of $1,000,000 per accident. The Policy will also include a Waiver of Subrogation in favor of The Village of Evergreen Park. y Umbrella Liability: Umbrella Liability Policy for not less than $2,000,000. The contractor and sub contractors shall pay wages at the rates not less than those prevailing on similar constriction in the locality as determined by the Secretary of Labor in accordance with the Davis-Bacon Act as amended (40 U.S.C. 276-276a-5) and shall receive overtime compensation in accordance with and subject to the provisions of the Contract Work Hours and Safety Standards Act (40 U.S.C. 327-333) and the Contractor and sub contractors shall comply with all regulations issued pursuant to these Acts and other applicable Federal laws and regulations pertaining to labor standards. The Secretaiy of Labor has, with respect to the labor standards specified in this Section, the authority and functions set forth in Reorganization Plan Number 14of 1950 (5U.S.C. 113z-15) and Section 2 of the Act of June 13, 1934 as amended (40 U.S.C. 276c).

Award

Playgrounds / Parks / Athletic Fields

$60,905.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
179
Active Projects
90
Bidding Soon
1,776
All Active Projects
783
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 28, 2024

April 29, 2024

img_map_placeholder

To Be Determined, Evergreen Park, IL

Related To This Project


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.