BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for a water / sewer project in Longview, Texas. Completed plans call for site work for a water / sewer project.

Final Clarifier Drive Repair (Drive & Starter Replacement): Remove existing pier supported, center drive unit of existing clarifier. Provide and install new pier supported, center drive unit, new NEMA 4x SS electrical panel, motor starter, controls; salvage and re-use existing drive platform deck and handrails. Re-assemble clarifier unit including level, plumb, and adjust. Complete testing, startup, and commissioning. Existing handrail, electrical, conduit, and stairs to remain. Protect from damage and paint/primer overspray. Remove handrails, conduit, wire, etc. as needed for Work and replace to as good or better condition as approved by the Engineer. Coordinate final adjustment and startup with other Work in awarded bid schedules. Final Clarifier No. 1 Painting: Blast, prime, and paint existing clarifier equipment within clarifier basin including rake arms, pipes, troughs, angles, cables, channels, column, cage, supports, drive platform, and appurtenances. Existing handrails and conduit are excluded. Blast, prime, and paint existing bridge structure within the existing clarifier basin including, trusses, angles, channels, decking, plates, and appurtenances. Existing HDG metals, handrails, conduit, electrical, and stairs are excluded. Blast, prime, and paint existing steel v-notch weir within existing clarifier basin in-place including both exposed faces and both edges, plates, nuts, bolts. Existing handrail, electrical, conduit, and stairs to remain. Protect from damage and paint/primer overspray. Remove handrails, conduit, wire, etc. as needed for Work and replace to as good or better condition as approved by the Engineer. Remove and Replace Bridge Walkway Decking for Final Clarifier No. 1: Remove existing steel diamond tread plate on the existing bridge between HDG stair landing and drive platform. Cut welds and grind support structure smooth. Repair damage to bridge structure by filling with welding rod and/or patch plates. Provide and install new 3/16-in steel diamond tread plate on existing bridge. Weld plates in place. Weld plates at seams. Blast, prime, and paint new steel diamond treads (top/bottom faces and edges). Blast, prime, and paint support structures and repair bridge paint. Existing handrail, electrical, conduit, and stairs to remain. Protect from damage and paint/primer overspray. Remove handrails, conduit, wire, etc. as needed for Work and replace to as good or better condition as approved by the Engineer. Remove and Replace Rake Arm Squeegees Remove existing rake arm squeegees and squeegee attachment hardware. Coordinate with Bid Schedule 2 for blast, prime, paint existing rake arm c-channels. Provide and install new 16 ga, 304 stainless steel squeegees using new HDG hardware. Adjust squeegees for proper alignment and clearances. Coordinate with Bid Schedule 1 for clarifier alignment, leveling, and commissioning and make final adjustment to squeegees for proper operation. Remove and Replace Rake Arm Tie Rod Clip Assemblies Ties rods vary in length and diameter based on position/location. Mark tie rod assemblies prior to removal for proper installation after clip replacement is completed. Mark location of clips to be replaced prior to removal to ensure proper installation of tie rod assemblies after clip replacement. Properly support rake arm and clarifier equipment during Work to protect equipment from damage. Protect grouted floor from damage. Remove existing tie rod assembly for clips to be replaced. Do not damage tie rods, appurtenances, and/or connecting bolts/nuts. Salvage all for re-installation after clip replacement. Any materials damaged by the Contractor during removal shall be replaced with Engineer approved materials at no additional cost to the Owner. Remove existing tie rod clip to be replaced. Grind smooth existing surfaces to receive new clip assembly. Repair damaged surfaces by filling with welding rod and/or patch plate(s). Provide and install new tie rod clip assembly for upper attachment and/or lower attachment as needed. Coordinate blast, prime, painting of installed clip assemblies with painting. Re-install salvaged tie rod assemblies. Align, adjust, level, rakes arms. Coordinate with final commissioning and startup under clarifier drive replacement. Make final adjustments to rakes arms during startup and commissioning for proper operation of the clarifier. Please submit questions for this project at least five (5) days prior to bid opening through www.civcastusa.com in the Q&A portal. All addenda issued for this project will only be posted on www.civcastusa.com. You will be notified of addenda automatically through email if you downloaded your plans and specifications via www.civcastusa.com. No interpretation of the meaning of the plans, specifications or other pre-bid documents will be made to any Bidder orally. Every request for such interpretation should be submitted in writing by posting on the Q&A portal on www.civcastusa.com, and to be given consideration must be received at least five days prior to the date fixed for the opening of Proposals. Question Deadline 04/04/2024 Please submit questions for this project at least five (5) days prior to bid opening through www.civcastusa.com in the Q&A portal. All addenda issued for this project will only be posted on www.civcastusa.com. You will be notified of addenda automatically through email if you downloaded your plans and specifications via www.civcastusa.com.

Award

Water / Sewer

$239,725.00

Public - City

Site Work

9

22

4

6

Subscribe For Documents

36 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
82
Active Projects
40
Bidding Soon
745
All Active Projects
344
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Find better bids. Win.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 9, 2024

June 10, 2024

July 8, 2024

img_map_placeholder

5211 W Loop 281, Longview, TX

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.