BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Site work for an educational facility in Barrington, Illinois. Completed plans call for site work for a educational facility.

Precast Concrete Wall Panel Sealant Removal and Replacement at the Barrington High School. All Bidders Must Be Pre-qualified. Bid Security in the Form of a Bid Bond in an Amount Equal to 10 Percent of the Base Bid Amount Shall Be Submitted With the Bid. Bid Bond Shall Be Payable to the Owner. All Bidders Must Comply With Applicable Illinois Law Requiring the Payment of Prevailing Wages by All Contractors Working on Public Work Projects. Bidder Must Comply With the Illinois Statutory Requirements Regarding Labor, Including Equal Employment Opportunity Laws. All Bidders, Prior to Receiving Bidding Documents, Must Pre-qualified by the Architect, andHave $5 Million in Umbrella Excess Liability Insurance Over Primary Insurance Prior to Obtaining Bid Documents. The Owner Reserves the Right to Reject Any or All Bids or Parts Thereof, or Waive Any Irregularities or Informalities, and to Make the Award in the Best Interest of the Owner. Precast Concrete Wall Panel Sealant Joint Replacement: . Removal of the existing sealant and backer rod. . Preparation of the concrete substrate: Removal of all foreign contaminates. . Tape off the joints as required to prevent sealant staining of the painted wall. . Installation of spray foam insulation into the joint: rake back. . Installation of open cell foam rod, primer and sealant. . Installation of open cell foam rod, primer and sealant.

Bid Results

Educational

$140,900.00

Public - City

Site Work

16

7

3

Subscribe For Documents

6 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
189
Active Projects
105
Bidding Soon
2,147
All Active Projects
920
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

April 29, 2024

img_map_placeholder

616 W Main St, Barrington, IL

The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.