Site work for a water / sewer project in Fort Morgan, Colorado. Completed plans call for site work for a water / sewer project.

Project Summary: The project generally consists of seven (7) separate projects A-G involving one or more contractors relining aging clay tile sanitary sewer mains without the necessity of open cut excavation. Project A - Between Aurora St. & Euclid St from W. Platte Ave. to W. 7th Ave., 820-feet of 8" Sewer Main Project B - Between West St. and Walnut St. from W. Platte Ave. to W. 8th Ave., 1,430-feet of 8" Sewer Main Project C - Between Walnut St. and Maple St. from W. Platte Ave. to W. 8th Ave. 1,250-feet of 8" Sewer Main Project D - Between Maple St. and Deuel St. from W. Platte Ave. to W. 8th Ave. 1,250-feet of 8" Sewer Main Project E - Between State St. and Prospect St. from W. Platte Ave. to W. 8th Ave. 1,260-feet of 8" Sewer Main Project F - Between Carol St. and Diana St. from E. 9th Ave. to Fremont Ave. 330-feet of 8" Sewer Main Project G - 1100 Blk of Linda St. at E. Riverview Ave. 200-feet of 8" Sewer Main Questions: All questions must be in writing and addressed to Erik Sagel, Wastewater Collection Superintendent, at erik.sagel@cityoffortmorgan.com. The cutoff date and time for questions is Friday, March 22, 2024, at 9:00 a.m. It is the responsibility of prospective bidders to contact Erik Sagel at (970) 542-3911 to verify receipt of questions. Based upon such inquiry, the City may choose to issue an Addendum. Pre-bid Meeting: No pre-bid meeting Performance and Payment Bond. There is no Performance or Payment Bond required for this project. Maintenance Bond. The awarded Contractor must provide a two-year, 20% Maintenance Bond or Letter of Credit to cover defective workmanship and materials as required for this project. Proposed Schedule/Workplan. Provide tentative timeline with milestone, methodology, expectations from the City (e.g. staff, data, etc.). The projects are expected to be substantially completed no later than September 1, 2024. Prospective Bidders may bid on a single project or all projects. The bid may be awarded to more than one Bidder. Projects may be awarded individually or in whole based on the lowest responsible bid.

Award

Water / Sewer

$395,220.00

Public - City

Site Work

Documents for this project are exclusively Specifications. If Plans become available, we will add them here.

3

Subscribe For Documents

4 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
90
Active Projects
59
Bidding Soon
844
All Active Projects
360
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

March 29, 2024

April 29, 2024

img_map_placeholder

Multiple Locations, Fort Morgan, CO

Related To This Project


The best commercial construction data available. Period.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.