BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published June 15, 2024 at 8:00 PM

Updated June 16, 2024

Site work and paving for a road / highway in Piscataway, New Jersey. Completed plans call for site work for a road / highway; and for paving for a road / highway.

Patton Avenue roadway improvements phase-1 Question Deadline 03/27/2024 at 12:00 PM ET Electronic Questions at Online. In order to make sure your bid is timely received and included in the bid opening at 2:00pm, The Township recommends that your drop off your sealed bid by or before 12:00pm. A. The work includes, but is not limited to, the following items: 1. Maintenance and protection of traffic; traffic control plan; maintaining vehicle access to cross streets and adjacent properties; furnishing signs, drums, barricades, cones, flagman and all else required to maintain, protect and control traffic. 2. Soil erosion and sediment control improvements and practices. 3. Clearing site including existing curb removal (Item No. 7). 4. No separate payment will be made for relocation, excavation, removal, coordination, etc. with the respective utility companies. 5. Any utility relocation including but not limited to valves, boxes, poles, mains, hose connections, etc. shall be coordinated by contractor with respective utility company and without any charge to Town. Meeting ID: 834 3309 7116 Passcode: 981847 Dial by your location +1 646 876 9923 US (New York) Meeting ID: 834 3309 7116 Passcode: 981847

Award

Roads / Highways

$623,056.00

Public - City

Paving, Site Work

32

15

6

3

Subscribe For Documents

15 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
925
Active Projects
360
Bidding Soon
7,481
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

May 9, 2024

July 8, 2024

Project location map

Patton Ave, Piscataway, NJ


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.