BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Eat some turkey, then gobble up construction leads.

Our commercial construction data is best paired with a recliner and some football.

Site work for a civil project in Moreno Valley, California. Completed plans call for site work for a road / highway; and water / sewer project.

After said time, Bids will be publicly posted on OpenGov Procurement. Bids received after said time will not be accepted. Bids shall be valid for a period of 90 calendar days after the Bid opening date. The Contractor shall furnish, to the satisfaction of the Engineer, all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct and complete the Work in compliance with the Contract Documents. Extension of an existing 24" RCP Storm Drain line by approximately 2000 LF along Kitching Street and approximately 500 LF along Kalmia Avenue to capture runoff that causes flooding and erosion for nearby residents. Installation of an AC Road, AC Driveway and AC Dike will also be installed for maintenance purposes and to prevent erosion along Kitching Street. Other street related improvements are also included in the project. All questions regarding this solicitation must be submitted through OpenGov no later than Tuesday, April 2, 2024 at 2:00 PM. Bid Value: $1,765,200.00 Project is located in the City of Moreno Valley on Kitching Street approximately 50 feet south of the intersection with Shalu Avenue. Project location continues North on Kitching Street until the intersection with Kalmia Avenue and terminates approximately 500 feet east along Kalmia Avenue. The Contractor shall furnish, to the satisfaction of the Engineer, all labor, materials, tools, equipment, and incidentals, unless otherwise specified, to construct and complete this project (the "Work") in compliance with the Contract Documents. The successful Bidder will be required to furnish a Faithful Performance Bond and a Labor and Material Payment Bond each in an amount equal to one hundred percent (100%) of the Contract Price.

Award

Roads / Highways

$1,479,442.00

Public - City

Site Work

8

7

5

Subscribe For Documents

49 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
206
Active Projects
101
Bidding Soon
2,241
All Active Projects
1,011
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

June 17, 2024

img_map_placeholder

Kitching St, Moreno Valley, CA


The data you need to build the relationships you want. Try it free.

Access Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.