BLOCK PAGE!!!
Get Full Details

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Published April 29, 2024 at 8:00 PM

Updated April 30, 2024

Site work and paving for a mixed-use development in Boulder Junction, Wisconsin. Completed plans call for site work for a sidewalk / parking lot; for paving for a sidewalk / parking lot; playground / park / athletic field; and playground / park / athletic field.

All potential bidders must become certified by DOA prior to submitting bids on state construction projects with budgets over $50,000. In general, the work consists of: trail improvements along approximately four (4) miles of old forestry road consisting of erosion control, clearing, grubbing, construction staking, utility locates, clearing, grubbing, excavation, backfill, grading, ditching, subgrade reinforcement, base aggregate dense, breaker run, geotextile fabric, riprap, and restoration at twenty (20) individual sites along the project limits. The 2017-2019 Wisconsin State Budget (2017 Wisconsin Act 59) repealed Wisconsin's prevailing wage laws. Effective September 23, 2017, state prevailing wage requirements on state building projects no longer apply. These changes take effect for projects advertised for bid after September 23, 2017. This change does not affect the Federal Davis Bacon Act requirements.

Bid Results

Playgrounds / Parks / Athletic Fields

$225,250.00

Public - State/Provincial

Paving, Site Work

16

10

6

Subscribe For Documents

20 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
39
Active Projects
9
Bidding Soon
167
All Active Projects
0
Updated Recently

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

April 16, 2024

May 16, 2024

Project location map

4125 Co Hwy M, Boulder Junction, WI

Related To This Project


Recently Viewed

Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.