BLOCK PAGE!!!

Subscribe For Access

Privately Funded

Bidding Soon

Documents Available

Publicly Funded

Addenda Available

Post-Bid

Saving Project...

Renovation of a medical facility in Moncks Corner, South Carolina. Completed plans call for the renovation of a medical facility.

Berkeley MHC Entry Deck Improvements. Demolition and re-construction of existing wood decks and rails. The Project is limited to exterior work associated with demolition, re-construction and repair and replacement work associated with the Berkley Mental Health Center main entry deck and three (3) other decks and stairs. Work includes masonry repair, wood framing, composite decking, aluminum railings and other associated improvements. Project Location: 403 Stoney Landing Road, Mocks Corner, South Carolina 29461. Bid Security is Required in an Amount Not Less Than 5% of the Base Bid. Performance and Labor & Material Payment Bonds: the Successful Contractor Will Be Required to Provide Performance and Labor and Material Payment Bonds, Each in the Amount of 100% of the Contract Price. Project Location: SC DMH Berkeley Community Mental Health Center *The value for this project is based on a financial range. The value is listed as the highest possible cost from the range provided by a stakeholder or official project document. Construction Cost Range: $110,000 to $130,000 In general, the project consists of demolition and reconstruction of the existing wood decks and associated stairs at the berkeley mental health center in moncks corner, south carolina . the total area of existing deck is 1,250 square feet . the project does not enlarge or otherwise expand the existing decks . reconstruction includes new treated wood framing, composite deck boards, aluminum deck rail system and galvanized metal pipe handrail . existing split face concrete masonry unit pillasters are to be cleaned, repaired and tuck pointed as necessary . all work will be undertaken while the building remains occupied and fully operational. it is the contractor's responsibility to provide adequate barriers to protect the public during demolition and construction operations . phased construction is not required however, when work starts on the main entry deck, it must continue uninterrupted until it is complete. the intention is for the main entry deck to be out of use for the least amount of time possible. . all lumber shall be kiln dried after treatment (kdat) . all submittals are to be reviewed and approved and all materials are to be on site before notice to proceed will be issued . except as might be required for deck construction at existing exterior doors, the existing building interior is off limits to construction personnel

Post-Bid

Medical

$130,000.00

Public - State/Provincial

Renovation

14

15

3

Subscribe For Documents

13 Record(s)

Subscribe for All Details

Trades Specified

Division 00 - Lorem Ipsum

Division 00 - Lorem Ipsum

Lorem, Ipsum, Dolor, Sit amet

Find More Local Projects

Within 75 Miles of This Project
213
Active Projects
119
Bidding Soon
1,274
All Active Projects
582
Updated Recently

One Low Price

  • One license and one market
  • Details and key contacts on all bidding projects
  • Organize your pipeline with a digital bid board
  • Automatically match opportunities to your profile
  • Saved searches deliver daily project leads to your email inbox

Market Pricing Around

  • All Starter Product functionality
  • Access to all documents (plans, specifications, and addenda)
  • Access to planning projects
  • Access to contact information
  • Ability to Export

You’ve Reached the Free View Limit

Want to see more project and bidder data in your market? Check out our product options and see what works best for you and your business.

Come back in [[refresh_days]] to get [[project_count]] more free projects.

Sign-up for Instant Access.

Get Started Now

Get the right
data with Project Intelligence

Share with your network.

Project Shared

with

example@example.com

Upgrade now for industry‑leading commercial construction data.

You've reached the free-view limit.

Thousands of projects are added every week - don't miss out. Explore the best product options for your business and subscribe today.

Get Access Now

Choose what you would like to do.

Seen enough? Want to see more? Subscribe on your own or talk to one of our sales reps.

April 11, 2024

May 13, 2024

June 12, 2024

img_map_placeholder

403 Stoney Landing Rd, Moncks Corner, SC

Related To This Project


Fuel growth with access to the bidding project info your business needs.

Full details, including key contact information, important dates, plans and specifications, on over 500,000 Projects including 5000 updated daily available to subscribers.